My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/27 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:44:39 AM
Creation date
3/10/2017 11:43:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/27/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVLRETTUTY CO'T CIL A riD ®A TEEM"COOVER SHEET- <br /> PROJECT TITLE: <br /> Amendment No. 1 to Consent COUNCIL BILL# <br /> Professional Services X Action Originating Department Utilities <br /> Agreement with First Reading Contact Person John McClellan <br /> TetraTech/KCM for Second Reading Phone Number 257-8201 <br /> Consulting for Power Third Reading FOR AGENDA OF June 27th, 2007 <br /> Undergrounding at the Water Public Hearing <br /> Filtration Plant Initialed by: <br /> Department Head <br /> CAA V-4 <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filtration Plant Professional Services Amendment No. 1 Public Works - Utilities <br /> Agreement <br /> Amount Budgeted $38,500 <br /> Expenditure Required $-0- Account Number(s): UP-3200-1. <br /> Budget Remaining $38,500 <br /> Additional Required $-0- <br /> DETAILED SUMMARY STATEMENT: <br /> Because of the series of power outages experienced at the Water Filtration Plant this last winter season, the <br /> Utilities Division needed to study the feasibility of `undergrounding' the power distribution system at the <br /> plant. The engineering study currently in progress is assessing the cost and effectiveness of several <br /> alternatives for power undergrounding. Information received from PUD will be included in the feasibility <br /> analysis. The result of this contract will be a feasibility report discussing the various likely alternatives <br /> including cost estimates and local distribution layouts. <br /> This agenda item is for a"no-cost" contract amendment, to extend the performance period and completion <br /> date of this project. This amendment also acknowledges the acquisition of ECS by TetraTech/KCM, under <br /> which name ECS is now doing business. The original contract completion date is December 31, 2005. We <br /> wish to extend this to July 31, 2008. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Mayor to sign Amendment No. 1 to the professional services agreement with TetraTech/KCM, <br /> extending the performance period and completion date of this contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.