My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, Inc. 2/22/2017
>
Contracts
>
Capital Contract
>
American Process Group, Inc. 2/22/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 10:27:23 AM
Creation date
3/10/2017 1:47:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, Inc.
Approval Date
2/22/2017
Council Approval Date
1/25/2017
Department
Public Works
Department Project Manager
Chris Chesson
Subject / Project Title
2017 Biosolids Removal
Public Works WO Number
WO2600-4-1
Tracking Number
0000496
Total Compensation
$603,786.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
American Process Group Inc 6/15/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT,WASHINGTON <br /> CONTRACT PROVISIONS FOR <br /> 2017 BIOSOLIDS REMOVAL <br /> 1 WORK ORDER#2600-4-1 <br /> PROPOSAL <br /> I <br /> To the City Council <br /> Everett, Washington <br /> The undersigned bidder declares that he has carefully examined the Plans and Specifications,Notice to <br /> Contractors, Instructions to Bidders, Standard Specifications, General Provisions, Special Provisions, <br /> Appendix,Proposal, and Contract for the dredging and dewatering of approximately 2,000 dry tons of <br /> Class B biosolids, and other such work as may be necessary, in accordance with the Specifications, as <br /> shown on the Plans; that he has made such investigations as are necessary to determine the conditions <br /> to be encountered, and that if this Proposal is accepted he will enter into a contract with the City of <br /> Everett, Washington, in the form of Contract hereto annexed, will, to the extent required, provide the <br /> necessary equipment, tools, apparatus, and other means of construction, and will furnish all labor and <br /> materials as specified in these Contract Documents, or called for in the plans, or necessary to complete <br /> the work in the manner herein specified and according to the requirements of the Engineer. <br /> The undersigned bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, fine or corporation mentioned below, and no officer or employee of the City <br /> of Everett is personally or fmancially interested, directly or indirectly, in the Proposal or in any <br /> purchase of or sale of any materials or supplies for the work to which it relates, or any portion of the <br /> profits thereof. <br /> The undersigned bidder agrees that he/she will complete the work in all respects within thirty (30) <br /> working days from the date of written Notice to Proceed; that he will pay liquidated damages to the <br /> City in the amount specified in the Contract. <br /> Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) of the <br /> Proposal according to the conditions of the "Notice to Contractors" and "Instructions to Bidders" <br /> hereby attached. If this Proposal shall be accepted by the City of Everett, Washington, and the <br /> undersigned shall fail to execute a satisfactory contract and bond, as stated in the Instructions to <br /> Bidders hereto attached, within twenty(20) calendar days after the award date,then the City may, at its <br /> option,determine that the undersigned has abandoned the Contract and thereupon this Contract shall be <br /> null and void and the amount of the bid bond or certified check accompanying this Proposal shall be <br /> forfeited and become the property of the City of Everett,Washington. <br /> 1 <br /> 2017 Biosolids Removal DIVISION P,P-1 December 1,2016 <br /> WORK ORDER#2600-4-1 <br /> 9 <br /> _rovided <br /> to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.