My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> organizations as allowed on a case-by-case basis to provide assistance in <br /> the recruitment and placement of DBEs. <br /> 8. Documentation of GFE must include copies of each DBE and non-DBE 1 <br /> subcontractor quotes submitted to the Bidder when a non-DBE <br /> subcontractor is selected over a DBE for Work on the Contract. (ref. <br /> updated DBE regulations — 26.53(b)(2)(vi) &App. A) <br /> Administrative Reconsideration of GFE Documentation <br /> Any Bidder has the right to reconsideration but only for the purpose of reassessing <br /> the GFE documentation that was originally submitted with their Bid, and <br /> determined to be inadequate. <br /> • The Bidder must request within 48 hours of GFE determination and <br /> schedule a reconsideration hearing within seven calendar days of <br /> notification of being nonresponsive or forfeit the right to reconsideration. I <br /> • The reconsideration decision on the adequacy of the Bidder's GFE <br /> documentation shall be made by an official who did not take part in the <br /> original determination. <br /> • Only the GFE documentation submitted and evaluated to meeting the <br /> required DBE COA Goal shall be considered. Bidder shall not introduce <br /> new documentation at the reconsideration hearing. <br /> • The Bidder shall have the opportunity to meet in person with the official for I <br /> the purpose of setting forth the Bidder's position as to why the GFE <br /> documentation demonstrates a sufficient effort. <br /> • The reconsideration official shall provide the Bidder with a written decision <br /> on reconsideration within five working days of the hearing explaining the <br /> basis for their finding. I <br /> Procedures between Award and Execution <br /> After Award and prior to Execution, the Contractor shall provide the additional <br /> information described below. Failure to comply shall result in the forfeiture of the <br /> Bidder's Proposal bond or deposit. <br /> 1. Additional information for all successful DBEs as shown on the I <br /> Disadvantaged Business Enterprise Utilization Certification: <br /> a. Correct business name, federal employee identification number (if I <br /> available), and mailing address. <br /> b. List of all Bid items (with a clear description of the Work to be <br /> performed) assigned to each successful DBE, including the dollar <br /> value. <br /> c. Description of partial items (if any) to be sublet to each successful <br /> DBE specifying the Work committed under each item to be performed <br /> and including the dollar value of the DBE portion. <br /> 111 <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 40 November 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.