My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Material costs paid by the Contractor directly to the material supplier are not <br /> allowed. If proper procedures are not followed or the Engineer determines <br /> that the arrangement results in lack of independence for the DBE involved, no <br /> DBE credit will be given for the DBE's participation as it relates to the material <br /> cost. <br /> Prompt Payment <br /> Refer to Section 1-08.1 for Prompt Payment requirements associated with this <br /> ' contract. <br /> Reporting <br /> All certified DBE Work whether COA or race neutral participation is reported. <br /> 1 The Contractor shall submit a Monthly Report of Amounts Credited as DBE <br /> Participation (form #422-103) to the Project Engineer each month, regardless <br /> of whether payments were made or Work occurred, between Execution of the <br /> Contract and the final amounts paid to DBE contractor or Completion of the <br /> Contract. In the event that the payments to a DBE contractor have been made <br /> by an entity other than the Contractor, as in the case of a lower-tier <br /> Subcontractor or supplier, then the Contractor shall obtain evidence of <br /> payments from the paying entity and report these payments to the Engineer as <br /> described above on form #422-103. The monthly report is due 20 calendar <br /> days following the end of the month. <br /> Changes in COA Work Committed to DBE <br /> The Contractor shall utilize the COA DBEs to perform the work and supply the <br /> materials for which each is committed unless approved by the Engineer. The <br /> Contractor shall not be entitled to any payment for work or material completed by <br /> the Contractor or subcontractors that was committed to be completed by the COA <br /> 1 DBEs. <br /> Owner Initiated Changes <br /> The Engineer will consider the impact on DBE participation in instances where <br /> the Engineer changes Work that was committed to a DBE at the time of <br /> Contract Award. In such instances, the Contractor shall not be required to <br /> substitute for the Work but is encouraged to do so. The Engineer may direct <br /> DBE participation or solicitation of DBEs as part of a change order. <br /> Contractor-Initiated Changes <br /> The Contractor cannot reduce the amount of work of a COA DBE without good <br /> cause, even if the Contractor continues to meet the DBE COA Commitment <br /> through other means. Reducing a COA DBE's Commitment is viewed as a <br /> 1 partial DBE termination, subject to the procedures below. <br /> Original Quantity Underruns <br /> In the event that Work committed to a DBE firm as part of the COA underruns <br /> the original planned quantities the Contractor is encouraged to substitute the <br /> remaining applicable Work to another DBE but is not required to do so. <br /> Contractor Proposed DBE Substitutions <br /> Requests to substitute a COA DBE must be for good cause (see DBE <br /> termination process below), and requires the written approval of the Engineer. <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 43 November 16, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.