My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 5-04 Commercial HMA,docx <br /> 5-04 Hot Mix Asphalt <br /> 5-04.4 Measurement <br /> (******) <br /> Section 5-04.4 is supplement to read: <br /> "Commercial HMA" will be measured per each for the complete restoration of the <br /> disturbed asphalt area relating to the post foundation construction. <br /> Disturbance outside of the limits as defined in Construction Plans, or COE Standard <br /> Details #716, shall be restored by the Contractor without additional cost to the City, <br /> unless otherwise authorized by the Engineer prior to commencement of work. <br /> 5-04.5 Payment <br /> Section 5-04.5 is supplement to read: <br /> "Commercial HMA", per each. <br /> All incidental work required in removing existing asphalt, backfilling voids, and installing <br /> new asphalt shall be included in the unit Contract price, "Commerical HMA". <br /> Bid items that are not specifically mentioned as included shall be included in the unit <br /> contract prices of the various related bid items. <br /> I <br /> END DIVISIONS.rtf <br /> END DIVISION 5 <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 63 November 16, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.