Laserfiche WebLink
1 1 <br /> 2 The last paragraph is deleted. <br /> 3 <br /> 4 1-08.AP1 <br /> 5 Section 1-08, Prosecution and Progress <br /> 6 August 1, 2016 <br /> 1 7 1-08.1(1) Prompt Payment, Subcontract Completion and Return of Retainage <br /> 8 Withheld <br /> 9 In item number 5 of the first paragraph, "WSDOT" is revised to read "Contracting Agency". <br /> 1 10 <br /> 11 1-08.5 Time for Completion <br /> 12 In item 2c of the last paragraph, "Quarterly Reports" is revised to read "Monthly Reports". <br /> I 13 <br /> 14 1-09.AP1 <br /> 15 Section 1-09, Measurement and Payment <br /> 16 April 4, 2016 <br /> 17 1-09.6 Force Account <br /> 18 The second sentence of item number 4 is revised to read: <br /> 19 <br /> ' 20 <br /> 21 A "specialized service" is a work operation that is not typically done by worker <br /> classifications as defined by the Washington State Department of Labor and Industries <br /> 22 and by the Davis Bacon Act, and therefore bills by invoice for work in road, bridge and <br /> 23 municipal construction. <br /> 24 <br /> 25 1-10.AP1 <br /> 26 Section 1-10, Temporary Traffic Control <br /> 27 August 1, 2016 <br /> 28 1-10.1(2) Description <br /> 29 The first paragraph is revised to read: <br /> 30 <br /> ' 31 The Contractor shall provide flaggers and all other personnel required for labor for traffic <br /> 32 control activities that are not otherwise specified as being furnished by the Contracting <br /> 33 Agency. <br /> ' 34 <br /> 35 In the third paragraph, "Project Engineer" is revised to read "Engineer". <br /> 36 <br /> 37 The following new paragraph is inserted after the third paragraph: <br /> 38 <br /> 39 The Contractor shall keep lanes, on-ramps, and off-ramps, open to traffic at all times <br /> ' 40 <br /> 41 except when Work requires closures. Ramps shall not be closed on consecutive <br /> interchanges at the same time, unless approved by the Engineer. Lanes and ramps <br /> 42 shall be closed for the minimum time required to complete the Work. When paving hot <br /> ' 43 mix asphalt the Contractor may apply water to the pavement to shorten the time <br /> 44 required before reopening to traffic. <br /> 45 <br /> 1 <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />