My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' V"7/ Washington State <br /> ransportation Disadvantaged Business <br /> Department of TEnterprise Utilization Certification <br /> To be eligible for Award of this Contract the Bidder shall fill out and submit, as a supplement to its sealed Bid Proposal, <br /> I a Disadvantaged Business Enterprise (DBE) Utilization Certification. The Contracting Agency shall consider as non- <br /> responsive and shall reject any Bid Proposal that does not contain a DBE Utilization Certification which properly <br /> demonstrates that the Bidder will meet the DBE participation requirements in one of the manners provided for in the <br /> I proposed Contract. Refer to the instructions on Page 2 when filling out this form or the Bid may be rejected.An <br /> example form has been provided on Page 3.The successful Bidder's DBE Utilization Certification shall be deemed a <br /> part of the resulting Contract. <br /> Box 1: 7?,;, /1.41,1 tic • certifies that the DBE firms listed below have been contacted <br /> I regarding participatron on this project. If this Bidder is successful on this project and is awarded the Contract, it shall <br /> assure that subcontracts� or supply agreements are executed with named DBEs. (If necessary, use additional sheets.) <br /> Lj21-cQ— <br /> Box 2: 1 f 7 _2-37k/5.-"GA'A,-. fS.., <br /> IColumn 1 Column 2 Column 3 Column 4 Column 5 <br /> Name of DBE Project Role Description of Work Amount Amount to be <br /> I (See instructions) (See instructions) (See instructions) Subcontracted Applied Towards <br /> to DBE Goal <br /> (See instructions) (See instructions) <br /> µ:5b„,47 per/k.."—$„fpr S,S..s «'/y 41 bay' o..dy <br /> I <br /> ft:7(44 f - GL G 501194'4V (-A.20-...r--7.f.724,,,/) 26 so PO 4(/5;oo b <br /> P4c of 9 389 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> IDisadvantaged Business Enterprise 8y Total DBE Commitment 2.912 <br /> Condition of Award Contract Goal Box 3 Box 4 <br /> I5(I By checking Box 5 the Bidder is stating that their attempts to solicit sufficient DBE participation to meet <br /> the OA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with <br /> Section 1-02.9 of the Contract <br /> IoDOT Form 272-056 <br /> i 165 Disdastfgel3hb'siness Enterprise Utilization Certification <br /> ded to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.