My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> sIII a APWA-WA Division 1 Committee rev. 1/8/2016 <br /> IProposal for Incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br /> Ipropose below, the total percent of construction aggregate and concrete materials to be <br /> incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br /> 111 <br /> of Recycled Material, of the Standard Specifications. <br /> Proposed total percentage: percent. <br /> INote: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> I percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> I materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br /> 1-06.6 of the Special Provisions. <br /> I Bidder: -T(I,,,7 (��,4 4 <br /> Signature of Authorized Official: tie---/-------- <br /> J <br /> I <br /> Date: /- 9- -ci7 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i168 Proposal for Incorporating Recycled Materials into the Project <br /> ed to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.