Laserfiche WebLink
CITY OF EVERETT,WASHINGTON <br /> ' CONTRACT <br /> THIS CONTRACT is made and entered into this 1 S{ day of M-qz ( `1, 2017, by <br /> ' and between the City of Everett, Washington, a municipal corporation existing under the laws <br /> of the State of Washington, hereinafter called the "City," and <br /> TiZ\tJ ► y CoNiQJNC3Tg,2S a-N:- <br /> , a W ASN i N c 6')C2-Pop-P.-C.k.0 s ,hereinafter called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> agrees to furnish all labor, tools, materials, equipment, and supplies required to build and <br /> construct and to build and construct in a workmanlike manner the work, improvements, and <br /> appurtenances in accordance with the Specifications and Plans entitled: "CITYWIDE <br /> INTERSECTION SIGNING PROJECT"(the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are <br /> incorporated by reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders <br /> ' C. Washington State Department of Transportation Standard Specifications 2012 as <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> ("Standard Specifications"). <br /> D. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda(if any) <br /> G. Performance Bond and Payment Bond <br /> H. Contractor's Proposal/Bid(conformed copy dated 0 ) - 0- 17 ) <br /> I. All provisions required by law whether set forth and reproduced herein or not. <br /> J. Disadvantage Business Enterprise (DBE) utilization certification. <br /> 2. Time for Completion. Substantial completion shall be achieved within 100 working <br /> days of the effective date of the Notice to Proceed. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to <br /> additional expense in the event that the Contractor does not complete the work in all respects <br /> and have it ready for use by the substantial completion date stated. Because it is difficult to <br /> accurately compute the amount of such costs and damages, the Contractor hereby covenants <br /> and agrees to pay to the City liquidated damages as computed in Section 1-08.9 of the <br /> Standard Specifications, for each and every working day required to accomplish substantial <br /> completion of the work in excess of the period established above for substantial completion. <br /> 1 <br /> ' CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439); COE#3628 1 November 30, 2016 <br />