My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> ROAD <br /> ONSTRUCTION i <br /> I <br /> AHEAD <br /> (w20-1) SEE NOTE 1 <br /> ROAD <br /> I '- NARROWS ' <br /> (W5-1) SEE NOTE 1 <br /> I <br /> ❑o <br /> 1 a TAPER LENGTH Cl <br /> u_ (TABLE A) <br /> a <br /> I <br /> 2 WORK AREA <br /> 79 <br /> TABLE A Q'i•�•�'i•�•i� <br /> TAPER LENGTH � � <br /> Q SPEED FOR CONE(S>ACING BUFFER ❑ ���♦ <br /> SPACING p� �������/ <br /> N, (MPH) SHIFT WIDTH (Fr) t <br /> v 5' 6' TANGENT TAPER ROLL SPACING <br /> 25 26' 31' 25 55 �° (MIN 50' MAX 100') <br /> `,"-i' 30 38' 45' 30 85 <br /> I 35 51' 61' 35 20 120 LJ ,-, <br /> A i i ilk <br /> 40 67' 80' 40 170 _ 11 ' 1 0.• <br /> 3 45 113' 135' 45 220 MIN ' MIN i��'' TRUCK WITH <br /> FLASHING OR WITH <br /> m NOTE: :1 0 BEACON <br /> 1. DISTANCE BETWEEN SIGNS SHALL BE 100' i <br /> o FOR RESIDENTIAL STREETS (25 MPH), AND �° i <br /> v o <br /> v 350' FOR ARTERIAL ROADWAYS BUFFER SPACE <br /> 3 2. FLASHING BEACON SHALL BE INSTALLED AT E ® (TABLE A) <br /> p EACH SIGN FOR NIGHT—TIME USE <br /> (OPTIONAL). Co A' p 3. DISTANCES MAY VARY AS APPROVED BY <br /> THE ENGINEER. 0 O° TAPER LENGTH <br /> O 4. FLAGGERS REQUIRED TO CONTROL TRAFFIC 0 O (TABLE A) <br /> l <br /> p WHENEVER THE CONTRACTOR MUST I <br /> v~i INTERRUPT TRAFFIC FLOW TO ACCESS THE <br /> C] <br /> z WORK SITE WITH MATERIALS OR EQUIPMENT. Aw <br /> oIa <br /> c 5. FOR ALTERNATE LANE SHIFT WIDTH REFER <br /> TO "MANUAL ON UNIFORM TRAFFIC , SEE NOTE 1 <br /> CONTROL DEVICES" (MUTCD) TABLE 6C-2 <br /> c <br /> PAGE 6C-10 <br /> °v 6. SIGN SIZE PER MUTCD. 111 <br /> � (W1-4 L) <br /> p 7. THIS PLAN IS PROVIDED AS A GUIDE ONLY. SEE NOTE 1 <br /> o FOR SPECIFIC INFORMATION ON TRAFFIC ROAD <br /> v CONTROL PLANS SEE CURRENT MUTCD. i 111 ONSTRUCTION, <br /> Ci T AHEAD <br /> 0 <br /> LEGEND: (w20 1) <br /> U <br /> IE] CONE OR CHANNELIZING DEVICE <br /> o (SEE STD 702) <br /> p <br /> LO <br /> I <br /> � ,— CITY OF EVERETT Traffic Control Plan 12-24-2003 <br /> j�� PUBLIC WORKS 2 Lane Roadway Partial Lane <br /> Date <br /> EVERETT DEPARTMENT Closure 701 B <br /> /// <br /> a — COE Std Dwq. <br />
The URL can be used to link to this page
Your browser does not support the video tag.