My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I , 1 1 , <br /> LEGEND: 1 <br /> 1 <br /> 1 NOTE: <br /> o CONE OR CHANNELIZING DEVICE <br /> 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR (SEE STD 702) <br /> RESIDENTIAL STREETS (25 MPH), AND 350' I <br /> FOR ARTERIAL ROADWAYS <br /> 2. FLASHING BEACON SHALL BE INSTALLED AT <br /> EACH SIGN FOR NIGHT-TIME USE (OPTIONAL). 1 <br /> I <br /> 1 3. DISTANCES MAY VARY AS APPROVED BY THE \ WORK AREA <br /> ENGINEER. \ <br /> 4. FLAGGERS REQUIRED TO CONTROL TRAFFIC ROLL SPACE <br /> WHENEVER THE CONTRACTOR MUST INTERRUPTIF <br /> :�•:'� 50'MIN 100'MAX <br /> TRUCK W/FLASHING <br /> TRAFFIC FLOW TO ACCESS THE WORK SITE •• <br /> n••••• <br /> WITH MATERIALS OR EQUIPMENT. YELLOW BEACON z\ — <br /> 0 <br /> 5. SIGN SIZE PER MUTCD. "NO / KEEP <0 w /) <br /> 'M <br /> /AI • 4/ — <br /> a 6. THIS PLAN IS PROVIDED AS A GUIDE ONLY. ;11 <br /> ♦ WITH o' zo <br /> o FOR SPECIFIC INFORMATION ON TRAFFIC LEFT 1 3 ` <br /> o CONTROL PLANS SEE CURRENT MUTCD. • /f o _ (W4-7A) <br /> z -1-- <br /> ® nom — <br /> III 0 Ilk <br /> y 200' <br /> I -'- <br /> INI I <br /> ? 1 _A r v-- 0 1 <br /> _� <br /> f <br /> O _.—..--II.- -- __-- — -., <br /> r 200' �, r g <br /> h. <br /> I -\\ 4 _, <br /> - <br /> 3 <br /> rs, <br /> •_ -� / <br /> it -4 <br /> _ ROAD <br /> I ; <br /> ,-1 ( ONSTRUCTION <br /> -1 <br /> AHEAD c 1,, <br /> 0 (W 20-1) i <br /> 1 <br /> 111)1 <br /> O <br /> 3 <br /> TAPER LENGTH <br /> � �O (TABLE A) � <br /> I 0 o v • <br /> 1- 1I • (W4 2R) <� <br /> w <br /> 0 <br /> I H- <br /> SEE NOTE 1 - <br /> ! <br /> g • <br /> 1 <br /> ce 1 <br /> 11 a \z/z (W4-2R) <br /> Y TABLE A SEE NOTE 1 <br /> E TAPER LENGTH <br /> 0 SPEED (FT) RIGHT LANE <br /> CONE SPACING CLOSED <br /> o ALONG TAPER AHEAD <br /> (MPH) OFFSET WIDTH (FT) SEE NOTE 1 <br /> o (W20-5R) <br /> 0 10 12 . <br /> if I <br /> I 1 ROAD <br /> 21 u .. 105 125 25 .I CONSTRUCTION <br /> n. 3C 150 180 30 jI �'� AHEAD <br /> L 35 205 245 35 I I (W20-1) <br /> c 40 270 320 40 � <br /> o 45 450 540 45 <br /> F 1 1 <br /> O - <br /> % - /CITY �� ����-�� TRAFFIC CONTROL PLAN 12-24-2003 <br /> I a %�• ,� 5 LANE ROADWAY WITH RIGHT LANE Date <br /> PUBLIC WORKS <br /> • E� Kerr ®EPARTtVAEtdT CLOSURE FAR SIDE OF 70 <br /> uINTERSECTION COE Std Dwc <br /> I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.