My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: <br /> Change Order <br /> No. <br /> Change Order Effective <br /> Date: <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, <br /> shall be adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the <br /> contract for seeking further equitable adjustment of time and compensation, <br /> including, but not limited to, delays, impacts, inefficiencies, overhead, and <br /> direct and indirect costs, and except as otherwise expressly provided herein, <br /> the Contractor will be barred from (a) asserting any claim for further <br /> adjustment of time and compensation arising out of, or relating to, the charges <br /> described in this Change Order or work described in Exhibit A and (b) <br /> asserting an equitable adjustment of time or price arising earlier than the date <br /> of this Change Order. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly <br /> provided notice of a differing site condition, protest, dispute, claim or Contract Claim <br /> as required by the Contract Documents. If the Contract Documents establish a <br /> time period for notice of a differing site condition, protest, dispute, claim, or <br /> Contract Claim that ends after the date of this Change Order, but relates to <br /> work performed prior to the date of this Change Order, then this provision <br /> does not apply if the Contractor timely and properly submits such notice. <br /> 1 5. This Change Order only changes the contract between Contractor and City to <br /> the extent explicitly provided herein. <br /> I <br /> ICITY <br /> Attest: Approved As to Form: <br /> I <br /> rMayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended BE <br /> Construction Project Engineer (if Engineering Manager Department Director <br /> Manager (if applicable) (if applicable) <br /> applicable) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.