|
1
<br /> I
<br /> Page 19
<br /> ENGI0302-003 06/01/2014
<br /> 1 CHELAN (WEST OF THE 120TH MERIDIAN) , CLALLAM, DOUGLAS (WEST OF
<br /> THE 120TH MERIDIAN) , GRAYS HARBOR, ISLAND, JEFFERSON, KING,
<br /> KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN) ,
<br /> II SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE
<br /> 120TH MERIDIAN) COUNTIES
<br /> I
<br /> PROJECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS
<br /> SHOWN BELOW)
<br /> Zone 1 (0-25 radius miles) :
<br /> II
<br /> Rates Fringes
<br /> Power equipment operators:
<br /> Group lA $ 38.39 17.39
<br /> Group IAA $ 38.96 17.39
<br /> I Group 'AAA $ 39.52 17.39
<br /> Group 1 $ 37.84 17.39
<br /> Group 2 $ 37.35 17.39
<br /> Group 3 $ 36.93 17.39
<br /> 11 Group 4 $ 34 .57 17.39
<br /> Zone Differential (Add to Zone 1 rates) :
<br /> II Zone 2 (26-45 radius miles) - $1.00
<br /> Zone 3 (Over 45 radius miles) - $1.30
<br /> BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent,
<br /> I Mount Vernon, Port Angeles, Port Townsend, Seattle,
<br /> Shelton, Wenatchee, Yakima
<br /> POWER EQUIPMENT OPERATORS CLASSIFICATIONS
<br /> IIGROUP lAAA - Cranes-over 300 tons, or 300 ft of boom
<br /> (including jib with attachments)
<br /> II GROUP IAA - Cranes 200 to 300 tons, or 250 ft of boom
<br /> (including jib with attachments) ; Tower crane over 175 ft
<br /> in height, base to boom
<br /> IIGROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom
<br /> (including jib with attachments) ; Crane-overhead, bridge
<br /> type, 100 tons and over; Tower crane up to 175 ft in height
<br /> II base to boom; Loaders-overhead, 8 yards and over; Shovels,
<br /> excavator, backhoes-6 yards and over with attachments
<br /> GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft
<br /> II
<br /> of boom (including jib with attachments) ; Crane-overhead,
<br /> bridge type, 45 tons thru 99 tons; Derricks on building
<br /> work; Excavator, shovel, backhoes over 3 yards and under 6
<br /> II yards; Hard tail end dump articulating off-road equipment
<br /> 45 yards and over; Loader- overhead 6 yards to, but not
<br /> including 8 yards; Mucking machine, mole, tunnel, drill
<br /> and/or shield; Quad 9, HD 41, D-10; Remote control operator
<br /> il on rubber tired earth moving equipment; Rollagon;
<br /> Scrapers-self propelled 45 yards and over; Slipform pavers;
<br /> Transporters, all truck or track type
<br /> IIWA160001 Modification 15
<br /> Federal Wage Determinations for Highway Construction
<br /> II
<br />
|