Laserfiche WebLink
Page 111 <br /> Category B Projects: 95% of the basic hourly reate for each <br /> group plus full fringe benefits applicable to category A <br /> projects shall apply to the following projects. A Reduced <br /> rates may be paid on the following: <br /> 1. Projects involving work on structures such as buildings <br /> and bridges whose total value is less than $1.5 million <br /> excluding mechanical, electrical, and utility portions of <br /> the contract. <br /> 2. Projects of less than $1 million where no building is <br /> involved. Surfacing and paving included, but utilities <br /> excluded. <br /> 3. Marine projects (docks, wharfs, etc. ) less than $150,000. <br /> HANDLING OF HAZARDOUS WASTE MATERIALS: <br /> Personnel in all craft classifications subject to working <br /> 11 inside a federally designated hazardous perimeter shall be <br /> elgible for compensation in accordance with the following <br /> group schedule relative to the level of hazardous waste as <br /> outlined in the specific hazardous waste project site <br /> safety plan. <br /> H-1 Base wage rate when on a hazardous waste site when not <br /> 1/ outfitted with protective clothing <br /> H-2 Class "C" Suit - Base wage rate plus $ .25 per hour. <br /> H-3 Class "B" Suit - Base wage rate plus $ .50 per hour. <br /> H-4 Class "A" Suit - Base wage rate plus $ .75 per hour. <br /> Zone Differential (Add to Zone 1 rates) : <br /> Zone 2 (26-45 radius miles) - $ .70 <br /> Zone 3 (Over 45 radius miles) - $1.00 <br /> BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, <br /> Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, <br /> Wenatchee, Yakima <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> WA160001 Modification 15 <br /> Federal Wage Determinations for Highway Construction <br /> I <br />