Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 13 <br /> GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; <br /> IA-frame crane over 10 tons; Drill oilers-auger type, truck or <br /> crane mount; Dozers-D-9 and under; Forklift-3000 lbs. and <br /> over with attachments; Horizontal/directional drill locator; <br /> Outside hoists-(elevators and manlifts) , air tuggers, strato <br /> tower bucket elevators; Hydralifts/boom trucks over 10 tons; <br /> Loader-elevating type, belt; Motor patrol <br /> grader-nonfinishing; Plant oiler- asphalt, crusher; <br /> I <br /> Pumps-concrete; Roller, plant mix or multi-lift materials; <br /> Saws-concrete; Scrpers-concrete and carry-all; Service <br /> engineer-equipment; Trenching machines; Truck Crane <br /> Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under <br /> GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; <br /> Concrete finish mahine-laser screed; Cranes-A frame-10 tons <br /> and under; Elevator and Manlift-permanent or shaft type; <br /> Gradechecker, Stakehop; Forklifts under 3000 lbs. with <br /> attachments; Hydralifts/boom trucks, 10 tons and under; Oil <br /> distributors, blower distribution and mulch seeding operator; <br /> Pavement breaker; Posthole digger, mechanical; Power plant; <br /> Pumps, water; Rigger and Gellman; Roller-other than plant <br /> mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment <br /> operator <br /> CATEGORY B PROJECTS: 95% OF THE BASIC HOURLY RATE FOR EACH <br /> GROUP PLUS FULL FRINGE BENEFITS APPLICABLE TO CATEGORY A <br /> PROJECTS SHALL APPLY TO THE FOLLOWING PROJECTS. REDUCED <br /> 11 RATES MAY BE PAID ON THE FOLLOWING: <br /> 1. Projects involving work on structures such as buildings <br /> and bridges whose total value is less than $1 .5 <br /> million excluding mechanical, electrical, and utility portions <br /> of the contract. <br /> 2. Projects of less than $1 million where no building is <br /> involved. Surfacing and paving including, but <br /> utilities excluded. <br /> 3. Marine projects (docks, wharfs, ect. ) less than $150, 000. <br /> HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft <br /> classifications subject to working inside a federally designed <br /> hazardous perimeter shall be elgible for compensation in <br /> accordance with the following group schedule relative to the <br /> level of hazardous waste as outlined in the specific hazardous <br /> waste project site safety plan. <br /> H-1 Base wage rate when on a hazardous waste site when not <br /> outfitted with protective clothing. <br /> H-2 Class "C" Suit - Base wage rate plus $.25 per hour. <br /> H-3 Class "B" Suit - Base wage rate plus $.50 per hour. <br /> H-4 Class "A" Suit - Base wage rate plus $.75 per hour. <br /> ENGI0370-002 06/01/2016 <br /> ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN) , <br /> WA160001 Modification 15 <br /> Federal Wage Determinations for Highway Construction <br /> I <br />