My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 117 <br /> GROUP 8: Cranes (85 tons and over, and all climbing, <br /> overhead,rail and tower) , all attachments including <br /> clamshell, dragline; Loaders (overhead and front-end, 10 <br /> yards and over) ; Helicopter Pilot <br /> ' BOOM PAY: (All Cranes, Including Tower) <br /> 180 ft to 250 ft $ .50 over scale <br /> Over 250 ft $ .80 over scale <br /> ' NOTE: <br /> In computing the length of the boom on Tower Cranes, they <br /> shall be measured from the base of the Tower to the point <br /> of the boom. <br /> HAZMAT: <br /> Anyone working on HAZMAT jobs, working with supplied air <br /> shall receive $1.00 an hour above classification. <br /> ENGI0612-012 06/01/2014 <br /> LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line <br /> extending west from the northern boundary of Wahkaikum County <br /> to the sea) AND THURSTON COUNTIES <br /> ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH <br /> GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. <br /> 11 ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. <br /> Zone 1 (0-25 radius miles) : <br /> Rates Fringes <br /> POWER EQUIPMENT OPERATOR <br /> GROUP lA $ 38.39 17.40 <br /> GROUP IAA $ 38.96 17.40 <br /> GROUP lAAA $ 39.52 17.40 <br /> GROUP 1 $ 37.84 17.40 <br /> GROUP 2 $ 37.35 17.40 <br /> GROUP 3 $ 36.93 17.40 <br /> GROUP 4 $ 34.57 17.40 <br /> Zone Differential (Add to Zone 1 rates) : <br /> Zone 2 (26-45 radius miles) = $1.00 <br /> ' Zone 3 (Over 45 radius miles) - $1.30 <br /> BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA <br /> I <br /> I <br /> WA160001 Modification 15 <br /> Federal Wage Determinations for Highway Construction <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.