Laserfiche WebLink
Page 19 <br /> GROUP 3 - Conveyors; Cranes through 19 tons with attachments; <br /> Crane-A-frame over 10 tons; Drill oilers-auger type, truck <br /> or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and <br /> over with attachments; Horizontal/directional drill <br /> locator; Outside Hoists- (elevators and manlifts) , air <br /> tuggers, strato tower bucket elevators; Hydralifts/boom <br /> trucks over 10 tons; Loaders-elevating type, belt; Motor <br /> patrol grader-nonfinishing; Plant oiler- asphalt, crusher; <br /> Pump-Concrete; Roller, plant mix or multi-lfit materials; <br /> ' Saws-concrete; Scrapers, concrete and carry all; Service <br /> engineers-equipment; Trenching machines; Truck crane <br /> oiler/driver under 100 tons; Tractors, backhoe under 75 hp <br /> GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; <br /> Concrete Finish Machine-laser screed; Cranes A-frame 10 <br /> tons and under; Elevator and manlift (permanent and shaft <br /> type) ; Forklifts-under 3000 lbs. with attachments; <br /> Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and <br /> under; Oil distributors, blower distribution and mulch <br /> ' seeding operator; Pavement breaker; Posthole <br /> digger-mechanical; Power plant; Pumps-water; Rigger and <br /> Bellman; Roller-other than plant mix; Wheel Tractors, <br /> farmall type; Shotcrete/gunite equipment operator <br /> FOOTNOTE A- Reduced rates may be paid on the following: <br /> 1. Projects involving work on structures such as buildings <br /> and bridges whose total value is less than $1.5 million <br /> excluding mechanical, electrical, and utility portions of <br /> the contract. <br /> 2. Projects of less than $1 million where no building is <br /> involved. Surfacing and paving included, but utilities <br /> excluded. <br /> 3. Marine projects (docks, wharfs, etc. ) less than $150,000. <br /> HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all <br /> ' craft classifications subject to working inside a federally <br /> designated hazardous perimeter shall be elgible for <br /> compensation in accordance with the following group <br /> schedule relative to the level of hazardous waste as <br /> outlined in the specific hazardous waste project site <br /> safety plan. <br /> H-1 Base wage rate when on a hazardous waste site when not <br /> ' outfitted with protective clothing, Class "D" Suit - Base <br /> wage rate plus $ .50 per hour. <br /> H-2 Class "C" Suit - Base wage rate plus $1.00 per hour. <br /> H-3 Class "B" Suit - Base wage rate plus $1.50 per hour. <br /> H-4 Class "A" Suit - Base wage rate plus $2.00 per hour. <br /> I <br /> WA160001 Modification 15 <br /> Federal Wage Determinations for Highway Construction <br />