Laserfiche WebLink
1 effectively collect these materials and prevent them from being washed or blown off the <br /> 2 Roadway or into waters of the State. Street sweepers shall not generate fugitive dust <br /> 3 and shall be designed and operated in compliance with applicable air quality standards. <br /> 4 <br /> 5 Material collected by the street sweeper shall be disposed of in accordance with Section <br /> ' 6 <br /> 7 2-03.3(7)C. <br /> 8 Street washing with water will require the concurrence of the Engineer. <br /> 9 <br /> 10 8-10.AP8 <br /> 11 Section 8-10, Guide Posts <br /> 12 January 4, 2016 <br /> 13 8-10.3 Construction Requirements <br /> 14 The last sentence of the second paragraph is deleted. <br /> 15 <br /> ' 16 8-i1.AP8 <br /> 17 Section 8-11, Guardrail <br /> ' 18 August 1, 2016 <br /> 19 8-11.3(1)F Removing and Resetting Beam Guardrail <br /> ' 20 The last sentence of the first paragraph is deleted. <br /> 21 <br /> 22 8-11.5 Payment <br /> 23 The paragraph following the Bid item "Removing and Resetting Beam Guardrail", per linear <br /> ' 24 foot is revised to read: <br /> 25 <br /> 26 The unit Contract price per linear foot for "Removing and Resetting Beam Guardrail" <br /> 27 shall be full payment for all costs to perform the Work as described in Section 8- <br /> 28 11.3(1)F, except for replacement posts and blocks. <br /> 29 <br /> 30 The paragraph following the Bid item "Raising Existing Beam Guardrail", per linear foot is <br /> 31 revised to read: <br /> 32 <br /> ' 33 <br /> 34 The unit Contract price per linear foot for "Raising Existing Beam Guardrail" shall be full <br /> payment for all costs to perform the Work as described in Section 8-11.3(1)E, except for <br /> 35 replacement posts and blocks. <br /> 36 <br /> 37 8-20.AP8 <br /> 38 Section 8-20, Illumination, Traffic Signal Systems, Intelligent Transportation <br /> 39 Systems, and Electrical <br /> 40 April 4, 2016 <br /> 41 8-20.3(5)A General <br /> 42 The last paragraph is revised to read: <br /> 43 <br /> ' 44 Immediately after the sizing mandrel has been pulled through, install an equipment <br /> 45 grounding conductor if applicable (see Section 8-20.3(9)) and any new or existing wire <br /> I <br /> ' AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 811/16 <br />