My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 Install a two grounding electrode system at each service entrance point, at each <br /> I 3 electrical service installation and at each separately derived power source. The service <br /> 4 entrance grounding electrode system shall conform to the "Service Ground" detail in the <br /> 5 Standard Plans. If soil conditions make vertical grounding electrode installation <br /> 6 impossible an alternate installation procedure as described in the NEC may be used. <br /> 7 Maintain a minimum of 6 feet of separation between any two grounding electrodes <br /> 8 within the grounding system. Grounding electrodes shall be bonded copper, ferrous <br /> I <br /> 9 core materials and shall be solid rods not less than 10 feet in length if they are 1/2 inch in <br /> 10 diameter or not less than 8 feet in length if they are % inch or larger in diameter. <br /> 11 <br /> 1 12 8-22.AP8 <br /> 13 Section 8-22, Pavement Marking <br /> I14 January 4, 2016 <br /> 15 8-22.4 Measurement <br /> I 16 The first two sentences of the fourth paragraph are revised to read: <br /> 17 <br /> 18 The measurement for "Painted Wide Lane Line", "Plastic Wide Lane Line", "Profiled <br /> 19 Plastic Wide Lane Line", "Painted Barrier Center Line", "Plastic Barrier Center Line", <br /> I 20 "Painted Stop Line", "Plastic Stop Line", "Painted Wide Dotted Entry Line", or "Plastic <br /> 21 Wide Dotted Entry Line" will be based on the total length of each painted, plastic or <br /> 22 profiled plastic line installed. No deduction will be made for the unmarked area when the <br /> I 23 marking includes a broken line such as, wide broken lane line, drop lane line, wide <br /> 24 dotted lane line or wide dotted entry line. <br /> 25 <br /> I 26 8-22.5 Payment <br /> 27 The following two new Bid items are inserted after the Bid item "Plastic Crosshatch Marking", <br /> 28 per linear foot: <br /> I 29 <br /> 30 "Painted Wide Dotted Entry Line", per linear foot. <br /> 31 <br /> I 32 "Plastic Wide Dotted Entry Line", per linear foot. <br /> 33 <br /> 34 9-03.AP9 <br /> 1 35 Section 9-03, Aggregates <br /> 36 August 1, 2016 <br /> I37 9-03.1(1) General Requirements <br /> 38 This first paragraph is supplemented with the following: <br /> 39 <br /> I <br /> 40 Reclaimed aggregate may be used if it complies with the specifications for Portland <br /> 41 Cement Concrete. Reclaimed aggregate is aggregate that has been recovered from <br /> 42 plastic concrete by washing away the cementitious materials. <br /> I 43 <br /> 44 9-03.1(2) Fine Aggregate for Portland Cement Concrete <br /> 45 This section is revised to read: <br /> 1 46 <br /> I <br /> I <br /> AMENDMENTS TO THE 2016 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/1/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.