Laserfiche WebLink
I <br /> I <br /> I Table of Contents <br /> INTRODUCTION TO THE SPECIAL PROVISIONS 3 <br /> DESCRIPTION OF WORK 4 <br /> Bid Procedures and Conditions 6 <br /> 1 1-02.2 Plans and Specifications 6 <br /> Examination of Plans, Specifications and Site of Work 7 <br /> IPreparation of Proposal 7 <br /> (August 3, 2015) 8 <br /> ICumulative Alternates Bidding 8 <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal 10 <br /> Control of Material 18 <br /> IBuy America 18 <br /> Load Limits 22 <br /> IWages 22 <br /> General 22 <br /> IRequirements for Nondiscrimination 24 <br /> Disadvantaged Business Enterprise Condition of Award Participation 31 <br /> Federal Agency Inspection 46 <br /> I (January 25, 2016) 46 <br /> Required Federal Aid Provisions 46 <br /> IUtilities and Similar Facilities 47 <br /> Public Convenience and Safety 48 <br /> IConstruction Under Traffic 48 <br /> 1-07.29 Community Project Liaison (CPL) 50 <br /> II (New Section) 50 <br /> 1-07.29(1) Description 50 <br /> 1-07.29(3) Construction Requirements 50 <br /> I1-07.29(4) Measurement 51 <br /> 1-07.29(5) Payment 51 <br /> IProsecution and Progress 53 <br /> Subcontracting 53 <br /> I Time for Completion 55 <br /> Payments 56 <br /> I <br /> Retainage 58 <br /> CITYWIDE INTERSECTION SIGNING <br /> IFED AID#HSIP-000S(439);COE#3628 1 November 16, 2016 <br />