Laserfiche WebLink
i <br /> r <br /> DIVISIONI.GR1 <br /> Division 1 <br /> General Requirements <br /> DESWORK.GR1 <br /> DESCRIPTION OF WORK <br /> FDESWORKI.DOCX I <br /> (March 13, 1995) <br /> This Contract provides for the improvement of *** upgrading Stop & Yield Signs and posts <br /> throughout the City of Everett *** and other work, all in accordance with the attached I <br /> Contract Plans, these Contract Provisions, and the Standard Specifications. <br /> 1-01.3.RTF <br /> 1-01.3 Definitions <br /> (January 4, 2016 APWA GSP) <br /> Delete the heading Completion Dates and the three paragraphs that follow it, and replace I <br /> them with the following: <br /> Dates I <br /> Bid Opening Date <br /> The date on which the Contracting Agency publicly opens and reads the Bids. <br /> Award Date <br /> The date of the formal decision of the Contracting Agency to accept the lowest <br /> responsible and responsive Bidder for the Work. <br /> Contract Execution Date <br /> The date the Contracting Agency officially binds the Agency to the Contract. <br /> Notice to Proceed Date I <br /> The date stated in the Notice to Proceed on which the Contract time begins. <br /> Substantial Completion Date <br /> The day the Engineer determines the Contracting Agency has full and unrestricted <br /> use and benefit of the facilities, both from the operational and safety standpoint, any <br /> remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> replacement of temporary substitute facilities, plant establishment periods, or <br /> correction or repair remains for the Physical Completion of the total Contract. <br /> Physical Completion Date <br /> The day all of the Work is physically completed on the project. All documentation <br /> required by the Contract and required by law does not necessarily need to be <br /> furnished by the Contractor by this date. <br /> Completion Date ' <br /> The day all the Work specified in the Contract is completed and all the obligations of <br /> the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> required by the Contract and required by law must be furnished by the Contractor <br /> before establishment of this date. <br /> 1 <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 4 November 16,2016 <br />