My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r <br /> DIVISIONI.GR1 <br /> Division 1 <br /> General Requirements <br /> DESWORK.GR1 <br /> DESCRIPTION OF WORK <br /> FDESWORKI.DOCX I <br /> (March 13, 1995) <br /> This Contract provides for the improvement of *** upgrading Stop & Yield Signs and posts <br /> throughout the City of Everett *** and other work, all in accordance with the attached I <br /> Contract Plans, these Contract Provisions, and the Standard Specifications. <br /> 1-01.3.RTF <br /> 1-01.3 Definitions <br /> (January 4, 2016 APWA GSP) <br /> Delete the heading Completion Dates and the three paragraphs that follow it, and replace I <br /> them with the following: <br /> Dates I <br /> Bid Opening Date <br /> The date on which the Contracting Agency publicly opens and reads the Bids. <br /> Award Date <br /> The date of the formal decision of the Contracting Agency to accept the lowest <br /> responsible and responsive Bidder for the Work. <br /> Contract Execution Date <br /> The date the Contracting Agency officially binds the Agency to the Contract. <br /> Notice to Proceed Date I <br /> The date stated in the Notice to Proceed on which the Contract time begins. <br /> Substantial Completion Date <br /> The day the Engineer determines the Contracting Agency has full and unrestricted <br /> use and benefit of the facilities, both from the operational and safety standpoint, any <br /> remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> replacement of temporary substitute facilities, plant establishment periods, or <br /> correction or repair remains for the Physical Completion of the total Contract. <br /> Physical Completion Date <br /> The day all of the Work is physically completed on the project. All documentation <br /> required by the Contract and required by law does not necessarily need to be <br /> furnished by the Contractor by this date. <br /> Completion Date ' <br /> The day all the Work specified in the Contract is completed and all the obligations of <br /> the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> required by the Contract and required by law must be furnished by the Contractor <br /> before establishment of this date. <br /> 1 <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 4 November 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.