I <br /> 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> of and time required for the various phases of the work, <br /> 4. A breakdown of costs assigned to any bid item, <br /> 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 6. Obtain and furnish a copy of, a business license to do business in the city or county <br /> where the work is located. <br /> 7. Any other information or action taken that is deemed necessary to ensure that the <br /> bidder is the lowest responsible bidder. <br /> I <br /> 1-03.1(1).RTF <br /> 1-03.1(1) Identical Bid Totals <br /> (January 4, 2016 APWA GSP) <br /> Revise this section to read: <br /> After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> highest percentage of recycled materials in the Project, per the form submitted with the <br /> Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> make the marking unseen. The slips will be placed inside a box. One authorized <br /> representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 1 alphabetic order by the name of the firm as registered with the Washington State <br /> Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal <br /> to the highest proposed recycled materials amount, are eligible to draw. <br /> COE 1-03.3.RTF <br /> 1-03.3 Execution of Contract <br /> (October 1, 2005 APWA GSP) <br /> Revise this section to read: <br /> Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> available for signature by the successful bidder on the first business day following <br /> award. The number of copies to be executed by the Contractor will be determined by the <br /> Contracting Agency. <br /> Within 20 calendar days after the award date, the successful bidder shall return <br /> the signed Contracting Agency-prepared contract, an insurance certification as required <br /> by Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. <br /> Before execution of the contract by the Contracting Agency, the successful bidder shall <br /> provide any pre-award information the Contracting Agency may require under Section 1- <br /> 02.15. <br /> I <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 13 November 16, 2016 <br />