My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinity Contractors, Inc 3/1/2017
>
Contracts
>
Capital Contract
>
Trinity Contractors, Inc 3/1/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:38:25 AM
Creation date
3/10/2017 2:24:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Trininty Contractors, Inc
Approval Date
3/1/2017
Council Approval Date
2/1/2017
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Citywide Intersection Signing Project
Public Works WO Number
PW3628
Tracking Number
0000497
Total Compensation
$653,910.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Trinity Contractors Inc 4/3/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Trinity Contractors Inc. 5/4/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1-03.Z RTF <br /> 1-03.7 Judicial Review <br /> (July 23, 2015 APWA GSP) <br /> Revise this section to read: <br /> Any decision made by the Contracting Agency regarding the Award and execution of the <br /> Contract or Bid rejection shall be conclusive subject to the scope of judicial review <br /> permitted under Washington Law. Such review, if any, shall be timely filed in the <br /> Superior Court of the county where the Contracting Agency headquarters is located, <br /> provided that where an action is asserted against a county, RCW 36.01.05 shall control <br /> venue and jurisdiction. <br /> 1-04.2,RTF <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> Specifications, and Addenda <br /> (March 13, 2012 APWA GSP) <br /> Revise the second paragraph to read: <br /> Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 1. Addenda, <br /> 2. Proposal Form, <br /> 3. Special Provisions, <br /> 4. Contract Plans, <br /> 1 5. Amendments to the Standard Specifications, <br /> 6. Standard Specifications, <br /> 7. Contracting Agency's Standard Plans or Details (if any), and <br /> 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 1-05,7,RTF <br /> a 1-05.7 Removal of Defective and Unauthorized Work <br /> (October 1, 2005 APWA GSP) <br /> Supplement this section with the following: <br /> If the Contractor fails to remedy defective or unauthorized work within the time specified <br /> ' in a written notice from the Engineer, or fails to perform any part of the work required by <br /> the Contract Documents, the Engineer may correct and remedy such work as may be <br /> identified in the written notice, with Contracting Agency forces or by such other means <br /> as the Contracting Agency may deem necessary. <br /> If the Contractor fails to comply with a written order to remedy what the Engineer <br /> determines to be an emergency situation, the Engineer may have the defective and <br /> unauthorized work corrected immediately, have the rejected work removed and <br /> replaced, or have work the Contractor refuses to perform completed by using <br /> Contracting Agency or other forces. An emergency situation is any situation when, in the <br /> I <br /> CITYWIDE INTERSECTION SIGNING <br /> FED AID#HSIP-000S(439);COE#3628 15 November 16, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.