My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates, Inc. 2/10/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Krazan & Associates, Inc. 2/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 3:23:40 PM
Creation date
3/10/2017 3:23:27 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates, Inc.
Approval Date
2/10/2017
Council Approval Date
2/1/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
On-call materials testing
Tracking Number
0000502
Total Compensation
$100,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B.1 <br /> mow <br /> IOW <br /> MOM AM AMIONI 201 7/2018 Fee Schedule - City of Everett <br /> azan <br /> Cost of Services <br /> Unless expressly stated in a project-specific Proposal or Agreement,services are provided on a time-and-expense basis,subject to the <br /> Basis of Charges presented above. Where provided,Cost Estimates are provided in good faith based on the scope of work and <br /> assumptions outlined in the Proposal. The term"Cost Estimate"does not imply a maximum contract amount,but only the extension <br /> value of our unit prices at the time of proposal preparation. <br /> Insurance <br /> Krazan & Associates, Inc. carries in excess of all insurance required by law. Additional costs of extra insurance certificates, co- <br /> insurance endorsements or additional insurance will be charged to the client at cost plus 20%. <br /> Prevailing Wage Rates <br /> The rates presented in this Fee Schedule are not applicable for projects where Prevailing Wage or other collective bargaining labor and <br /> benefits rates apply. Our past experience on government funded projects in the Northwest Region (Washington/Oregon/Idaho), <br /> including those subject to Davis-Bacon and related Acts(DBRA) wage requirements is that there is no existing determination for the <br /> professional services that we provide and that our services are NOT subject to those wage provisions. In the event that you as our <br /> client believe we are subject to Prevailing Wage requirements, it is your responsibility to submit a request to the Lead Agency so that <br /> they can obtain a determination from the U.S. Secretary of Labor. In the event that a prevailing wage determination is made, and <br /> where the determination is made that the combined rate of pay plus fringes exceeds $22.70 per hour we will need to adjust our billing <br /> rate proportionally to reflect the percentage of increase above $22.70 per hour. In the event that your project is a Prevailing Wage <br /> project please notify Krazan&Associates so we can provide you with applicable rates. <br /> Cost-Of-Living Adjustment <br /> The rates presented in this Fee Schedule are applicable only through December 31,2018. Krazan&Associates should be contacted to <br /> obtain rates applicable for your project area and the year in which our services are to be provided. Where projects are on-going <br /> beyond December 31 of the year the services were initiated, the rates presented in this fee schedule are subject to an annual cost of <br /> living adjustment based on the consumer price index for the geographic area where our services are being provided,but in no case less <br /> than 2 percent. For non-prevailing wage projects rates may be fixed for the duration of a project where the duration is one year or less <br /> where so specified in a project-specific proposal or rate table; project rates will then be negotiated on an annual basis. Should a <br /> DBRA determination be made and where there is an automatic escalation of the rate during the term of the agreement the escalation <br /> rate(in percent increase)shall apply to our billing rates. <br /> Attachment A-Page 11 of 11 2017 Fee Schedule-City of Everett.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.