Laserfiche WebLink
(7) CB 0707-44 —3rd and final Reading - Adopt the Proposed Ordinance amending <br /> Ordinance No. 2021-94, as amended, the Comprehensive Plan map from Single <br /> Family Detached (1.1) to Single Family Attached (1.4) for a site located east of 21st <br /> Drive SE and south of 96th Place SE <br /> (8) CB 0707-45 —3rd and final Reading - Adopt the Proposed Ordinance amending <br /> Ordinance No. 1671-89, as amended, rezoning property located at 216 Mukilteo <br /> Boulevard from Single Family (R-1) to Community Business (B-2), subject to <br /> conditions of a development agreement <br /> (9) CB 0707-46 —3rd and final Reading - Adopt the Proposed Ordinance amending <br /> Ordinance No. 2021-94, as amended, the Comprehensive Plan map from Heavy <br /> Industrial (5.1) to Central Business District (3.1) and amending section 2.020 of <br /> Ordinance No. 1671-89, as amended (EMC 19.02.020), with a rezone from M-2 <br /> (Heavy Manufacturing) to B-3 (Central Business District) on a site located west of <br /> Bond Street, between Hewitt Street and Wall Street <br /> ACTION ITEMS: (to be considered individually) <br /> (10) Authorize the Mayor to sign an Agreement with Pentec/Hart Crowser to provide <br /> salmon recovery fisheries advice for the next year for an amount not to exceed <br /> $20,000 <br /> (11) Award contract and Authorize the Mayor to sign the contract for Sewer System <br /> Replacement"I" and Watermain Replacement"J" Projects to KLB Construction Co., <br /> Inc., the lowest responsive bidder, in the amount of $2,994,526.85 <br /> (12) Authorize the Mayor to sign the Professional Services Agreement with David Evans <br /> and Associates, Inc. to provide a feasibility and location study for a pedestrian <br /> crossing of the Burlington Northern Santa Fe rail line between Everett Station and <br /> the Riverfront Development in the amount of $13, 900.00 <br /> (13) Authorize the Mayor to sign the Professional Services Agreement with MacLeod <br /> Reckord to provide general engineering and management consulting services for <br /> the Riverfront Development project entitled "Public Amenities and Wetland <br /> Enhancements" in the amount of $893,000.00 <br /> (14) Award construction contract for the 2007 Hot Mix Overlay Project to Rinker <br /> Materials, of Everett, WA, in the amount of $1,806,186.30 <br /> (15) Authorize the Mayor to sign Amendment No. 2 to the Professional Services <br /> Agreement with GeoEngineers for the Silver Lake Dredging Plan extending the <br /> agreement from July 20, 2007 to December 31, 2007 <br />