My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 78TH PL SE 2017-03-16
>
Address Records
>
78TH PL SE
>
2015
>
2015 78TH PL SE 2017-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 2:19:15 PM
Creation date
3/13/2017 11:36:54 AM
Metadata
Fields
Template:
Address Document
Street Name
78TH PL SE
Street Number
2015
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Energy Code WASHINGTON STA IEUNIVERSITY <br /> SuEXTENSION ENERGY PROGRAM <br /> prt <br /> Residential Building Air Leakage Test (Blower Door Test) Results <br /> Permit#: <br /> House address or lot number: ALL � j 1 Pi SE <br /> City: Zip: 2._0-5 <br /> Cond. Floor Area (ft2): 2 91- Age of house: <br /> Source (circle one): ( Plans ) Estimated Measured <br /> Results shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: <br /> ACH50= (CFM50 x 60)/Volume <br /> Where: <br /> CFM50 = Blower door fan flow at 50 Pascal pressure difference <br /> Volume=Conditioned Floor Area of the housing unit x ceiling height <br /> Blower Door Test Result: 3 c4 ACH50 <br /> 3c) CFM@50Pa <br /> Ring (circle one if applicable): Open A B C <br /> Blower Door Fan Location: 142-C( CL ( Weather Conditions: b(l) o1/4,/,(1 e7(. <br /> I certify that these blower door results are accurate and determined using standard industry protocol. <br /> Company Name: E Co T he r YY\ Technician: Iv ntC&k i C\Clr - <br /> Technician Signature:`�� /1A"A (.� i--Date: 1( ' 261 • ( Phone Number: CD w 2449 <br /> 2012 Washington State Energy Code reference: <br /> R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not <br /> exceeding 5 air changes per hour in Climate Zones l and 2,and 3 5 air changes per hour in Climate Zones 3 through 8. <br /> Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Where required by the <br /> code official,testing shall be conducted by an approved third party.A written report of the results of the test shall be <br /> signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after <br /> creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed the presence of a <br /> gasket(see Section 502.4),operable windows and doors manufactured by small business shall be permitted to be <br /> sealed off at the frame prior to the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.