My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 78TH PL SE 2017-03-16
>
Address Records
>
78TH PL SE
>
2015
>
2015 78TH PL SE 2017-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 2:19:15 PM
Creation date
3/13/2017 11:36:54 AM
Metadata
Fields
Template:
Address Document
Street Name
78TH PL SE
Street Number
2015
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-.1111plk PUBLIC WORKS PERMIT Date: 3/28/2016 <br /> City of Everett Public Works Department Public Works Permit#: PW1603-063 <br /> 3200 Cedar Street Parent Permit#: C1603-007 <br /> zw.weerr Everett, WA 98201 <br /> Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALPINE HEIGHTS DEVELOPMENT <br /> 120 SW EVERETT MALL WAY SUITE <br /> EVERETT WA 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 28050800302700 SITE ADDRESS: 2015 78TH PL SE LOT 1 <br /> NEW TOWNHOUSE/TRAFFIC MITIGATION <br /> SPRINKLERS REQD. LANDSCAPE INSP REQD. (C1603-007, -008, -009 same plan set. 3 unit bldg)Any changes to the <br /> building facade requires planning approval. See attached pictures. <br /> SEC 08 TWP 28 RGE 05 <br /> LOT 1 ALPINE HGTS SUB14-003 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 Pi, <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. i <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert,ja 425 a9 7404, =03=-0 m w __4 w <br /> prior to starting construction and with other inspection requests. -z; i,_ ,.__, n; C-' ;. '-�; • <br /> 6. A sprinkler system is required for this building in compliance witFi'the`r�t t if mer is o " r [" l <br /> NFPA Standards 13D. S `., ~ <br /> 7. Install erosion control measures as determined by the Public Works Inspector, such m a' mom; Z <br /> t,,P <br /> as silt fence, straw bales, swales, or erosion blankets. „;;., `- g •,-ri = <br /> 8. Connect side sewer per City Standard #s 601 through 604. r.� O <br /> 9. Connect rooftop downspouts to the drainage system provided for tNiis lot. <br /> 10.All excavated material from foundation, sidewalk, and driveway4Vall be hauled.to an n; h <br /> approved, permitted site. No wasting of material is allowed on this ltlildilt.Zip _ 23' .,.,,....:4,1-3-1 p.-2 r;INi <br /> 11. No building materials to be stacked on sidewalk/roadway and sij��*1I-roac ,t ,a'°n�,�,L,, ,; .; <br /> LTi�'1`,V C;LN Ci v 0.1 S GS�a G'; ;L11 � <br /> be kept clean and open for pedestrian travel. �,i- <br /> -i cn-•a <br /> 12. Driveway to Garage shall be paved. <br /> I—,r..D Cr <br /> Public Works Fee Breakdown: C <br /> Plan Review$20.00 j' /�I <br /> Inspection $20.00 TO POSTING / <br /> PO <br /> Driveway$25.00 1 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> e_.. ,.,/ ,Ij Ae..644e____ <br /> 3 -a 9 --, c causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> AP/4d for onstr nDate remove same upon not e from the City and to replace public property <br /> Ni ; °__.—\\ _`\ (--)�_ ) (g damage') /thereby. / <br /> AL INSPEC ',• . Date .5 -4 //(v <br /> Approved as Constructed Sign ture of A.. ant Date <br /> t <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> i'Iti <br />
The URL can be used to link to this page
Your browser does not support the video tag.