Laserfiche WebLink
7 <br /> • Outline Project Milestones in table below. For example, include if applicable planning, permitting, right of way, <br /> contract advertisement,contract award,groundbreaking, project progress and completion. <br /> t?hoja L 1'MLestt3oes: Scheduled l 111e ;t:03rt+i 6.40ck (.Describe lss tes,problems&:good Ile*items) <br /> Final PE3/2007 Preliminary Engineering will be completed with local funds prior to grant award. <br /> Grant Award 7/2007 <br /> Final Design 1/2008 <br /> Final Environmental 1/2008 (Including Executive Order 05-05) <br /> Approvals <br /> Permitting 5/2008 <br /> Bid Advertisement 5/2008 • <br /> Award CN Contract t 7/2008 <br /> Start CN 8/2008 <br /> End CN 12/312008 <br /> MN <br /> M/Y <br /> MN <br /> Project Manager <br /> signature and date <br /> 10/12/2006 <br /> • <br /> 5 <br />