PRE-MANUFACTURED TRUSSES W/ ATTIC VENTILATION IS AT GABLE
<br /> R49 INSULATION TYP. ENDS WITH CONTINUOUS RIDGE y m
<br /> VENT SET PAN FLASHING INSTALLTION SEQUENCE m w
<br /> COMPOSITION SHINGLE /��
<br /> ROOFING OVER 30A FELT OVER /F ��� IN FULL BED OF
<br /> PLYWOOD ROOF SHEATHING �v./ HEAD FLASHING
<br /> WA11 SHEATHING
<br /> TAPE,E.G.,
<br /> 'DuPont',trU m
<br /> 11111111. INSTALLTION SEQUENCE SRL PAN DASHING,EG.. •StralghtFlasti
<br /> TYPICAL.U.N.O. � 1�2�r SEALANT I wALL FRAMING
<br /> PROVIDE VERTICAL SOLID BLOCKING PPP-
<br /> �� / HEAD DASHING / [DOE
<br /> MPTETO ROOF _ 26 SHEET WALL FRAMING , WOOD WINDOW HEAD TRIM
<br /> 111 IIi11/1/i/ I► METAL swghRa.h �,��
<br /> 2X RAFTER TAIL TYP.- •/►_ " l. NMUNc FLANGE M W1NDDw HEAD TPo4� '.I P • / `��������"` , , w
<br /> METAL GUTTER TYP. - // - ROUGH / "`f ���
<br /> �� ;, - I •.:-.''>:"
<br /> / �/ �`���p`""O nIAPIIE50.
<br /> , oPENINc :-.....,.,.. I��II�I •
<br /> /.:_....
<br /> 1Xfi OVER 2X8 RAKE FASCIA • = I �1, 7 �����"© / 1 : I��� o� � FlASNRIG TAPE
<br /> �n M1, g ') ' ' S 3t.
<br /> / RA9Ewc TAPE F.. -. . b�P Bi CaighKw.MC'_. a "aWEATHER RESISTANT&BRIER SKIRTIN WINDOWUNIT• mAL I Ay- ,,,A.- 1� 4 74 PtASfIC DHP1N SCREEN1X CEDAR SOFFIT �� ' "'ti � ".� • "Th /VAPOR RETARDER 'e'Z-s 1 SIDE FL.SARNG ; cn
<br /> WELD ,c' Z: WEATHER RESISTANT BARRIER,
<br /> 1011gI / - _ :=:,vsa�r=' \ EC.,'DuPont',lyveF
<br /> 1 MI i JOINT v-'=,`{%� 2 DOOR UNIT 'DuPont','StralghtFloah' mF�ErT
<br /> HARDI HORIZONTAL SIDING OVER - 0 ''' ONE-PIECE DOOR PAH FLASHING I FE
<br /> (2)LAYERS 60 MIN.BUILDING PAPER = VERIFY DIMENSION FABRICATION -RESTER m°ETAaQ ''AA
<br /> VI
<br /> ® 0
<br /> ON PLYWOOD SHEATHING,TYP. 11 FLOOR FRAMING w WITH DECK CONDITIONS DETAIL SELF ADHESIVE BUTYL FLASHING WINDOW INSTALLATION GUIDE CA
<br /> CA
<br /> 2►� PER STRUCTURAL
<br /> ENGINEER o. 3'
<br /> \ O TYP. DOOR PAN FLASHING WERHER RESISTANT BARRIER,
<br /> xi
<br /> 2X6 STUDS @ 16'Co/ W!R-21 BATT �7 ED.'DuPont'•Tyvole
<br /> I. VERIFY ROUGH OPENING-MEASURE AHE ROUGH OPENING AND THE WINDOW TO DETERMINE THAT THE SIZE IS
<br /> INSULATION W/5/B'GNB TIP. ► SCALE : NONE CORRECT. THE ROUGH OPENING IS RECOMMENDED TO BE 3/4'LARGER THAN THE WINDOW UNIT IN WIDTH 6 I F E
<br /> i�►� WINDOW INSTALLATION GUIDE AND HEIGHT. ENSURE THAT THE ROUGH OPENING IS PLUMB,LEND.AND SQUARE. D < 3
<br /> bt
<br /> 2. APPLY• IT MRD FOLD THE WEATHER RESISTANT BARRIER. TAPE WEATHER RESISTANT BARRIER UP TO
<br /> IHR O B—VENT — TAPE ALL JOINTS WITH Ian 12" MAX. 1. VERIFY ROUGH OPENING-MEASURE THE ROUGH OPENING MD THE DOOR UNIT TO DETERMINE THAT ITE PROTECT IT DURING WINDOW INSTALLATKMN. / M CO 7:1
<br /> SIZE IS CORRECT. THE ROUGH OPENING S RECOMMENDED TO BE 3/4'LARGER THE DOOR UNIT IN
<br /> FINISH FLOOR OVER lag
<br /> FOIL TAPE MAINTAIN A MIN. OF FROM WIDTH AND HEIGHT. ENSURE THAT THE ROUGH OPENING IS PLUMB,LEVEL MD SQUARE
<br /> 0RE 3. APPLY SILL PM PUSHING.
<br /> PLYWOOD SHEATHING „ 1-INCH TO COMBUSTABLE MATERIALS 111114111 CEILING E APPLY,CUT MD FOLD THE WEATHER RESISTANT BARRIER. TAPEILL WEATHER RESISTANT BARRIER UP TO 4. APPLY PLASTIC DRAIN SCREEN-CUT SCREEN TO THE LENGTH OF THE SPLUS 2'. STAPLE TO THE —1
<br /> B. IN A VERTICAL RUN AND 3-INCHES U� PROTECT IT DURING DOOR INSTALLATION. EXTERIOR SHEATHING SURFACE 1/2'BELOW SILL EDGE. INSTALL STAPLES 1-1/2'BELOW SILL EDGE.
<br /> 2X12 FLOOR JOIST @ 16'o/c W/ = TO COMBUST ABLE MATERIALS ABOVE .M.111111111.1
<br /> "� �� 3. INSTAL DOOR PAN FLASHING IN FULL BET OF SEALANT. APPLY SELF-ADHESIVE FLASHING TO LOWER O s
<br /> R-38 BATT INSULATION A HORIZONTAL RUN OUTSIDE CORNERS. ROUGH OPENING SILL MUSE BE LEVEL-NO SHIMMING MEOWED. S. APPLY SILL SHIMS-APPLY 3/8'SHIMS TO THE BOTTOM PLATE TO ALLOW FOR INSULATION BETWEEN THE
<br /> i WINDOW SILL AND PLATE j
<br /> �� 51 AIR — SIZE 4. APPLY SEALANT TO THE WALL ACROSS JAMBS AND HEAD-APPLY SEMANT TO SILL PAN BACK DAM-DO O
<br /> P.T.SILL PLATE I=FAIDa TEMPERATURE AND 1117—
<br /> PER 9FALNIfS ARE RECOMMENCED.OT CAUL(OR TAPE THE SILL PAN,THIS MEOWS ANY INCIDENTAL WRIER TO ESCAPE. POLYURETHANE 9. ANYAPPLINCIDENTAL WATER TO ESCAPE.Y SEALANT TO IHE WALL �POLYURERNNE SEALANTS ARE RECOMMENDED. THE JABS AND HEAD-DO NOT CAULK OR TAPE SILL,THIS ALLOWS
<br /> A� PRESSURE RELIEF VALVE APPLWNCEN en
<br /> co
<br /> II 0! = REQ. 5. TILT DOOR INTO PLACE DO NOT SLIDE-CHECK BOTH INTERIOR AND EXTERIOR FOR LEVEL-PLUMB MD 7. INSERT AND FASTER THE MAROON-ONLY AT THE FOUR CORNERS,THEN SHIM THE UNIT AT THE JAMBS
<br /> II�� ENSURING THAT IT IS SQUARE CHECK BOTH INTERIOR AND EXTERIOR FDR LEVEL,PLUMB AND SQUARE. O /
<br /> 1-.o. PREFABRICATED RESTRAINT SYSTEM — SQUARE. SECURE THE UNIT PER MFR'S RECOMMENDATIONS THROUGH NAIL DNS,HEAD MD SIDE JAMBS WITH SECURE THE UNIT BY APPLYING 1-1/2'/e SCREWS 12 INCHES O.C. IN AREAS WHERE IMPACT GLASS IS O Z 03
<br /> S LOCATED IN UPPER AND LOWER THIRD OF S.U.�R ' REQUIRED OR IN HIGH WIND AREAS,INSTALL SCREWS AT 8-1/2'O.C. 0
<br /> �� TANK — INSTALL PER MFR'S INSTRUCTIONS B. APPLY THE JAMB FLASHING-TUCK THE TOP OF THE JAMB FLASHING UNDER THE FLAP OF THE WATER
<br /> Z T"I _
<br /> i
<br /> PROTECT VENTS WITH �`�' \ \ RESISTANT BARRIER AT THE HEAD. B AAPPE MAILING THE
<br /> WEATHER
<br /> RESIST�LLBARRIER SKIRT-APPLY FLASHING TAPE TO ADHERE THE SKIRT M FRONT OF O ■
<br /> il — MIN. 22GA X 3 4" STRAPS 7. INSTALL THE HEAD FLASHING AND INTEGRATE THE WAITER RESISTANT BARRIER. CUT A PIECE OF SELF O 0omol 1:1
<br /> GALA,SCREENS /
<br /> THE
<br /> SIDE FLASHING LONG ENOUGH TOI GO ACROSS THE TOP OF THE DOOR AND EXTEND AT LEAST t'PAST 9. APPLY THE JAMB FLASHING-TUCK THE TOP OF THE JAMB DASHING UNDER THE FLAP OF THE WATER
<br /> CONCRETE FOOTING 3/4° COPPER S i SIDE FLASHING TAPE ON BOTH SIDES. RESISTANT BARBER AT THE HEAD. Ce
<br /> SEE STRUCTURAL 11 Ij��]l�T TEMPERATURE AND E a E. INSTALL THE METAL HEAD FUSMNG AND WOOD HEAD DOOR TRIM. IO. INSTALL THE HEAD FLASHING TAPE AND INTEGRATE THE WATER RESISTANT BARRIER. CUT A PIECE OF SELF
<br /> PRESSURE RELIEF VALVE OUTSIDE ADHESIVE FLASHING LONG ENOUGH TO GO ACROSS THE TOP OF THE WINDOW AND EXTEND AT LEAST 1'PAST M
<br /> Av�� DRAIN — TO OUTSIDE 9. FOLD DOWN TOP FLM OF WEATHER RESISTANT BARRIER. REMOVE THE PREVIOUSLY APPLIED TAPE HOLDING THE SIDE FLASHING TAPE ON BOTH SIDES. 0
<br /> VENTILATE CRAWL SPACE ONE 1.1111111
<br /> _ `I
<br /> GRADE THE DAP OF THY WATER O PENT BARRIER THE HEAD. ALLOW THE FLAP 70 LAY OVER THE MEAD 90
<br /> 4"0 PERF.DRAINAGE PIPE WI 3/4" _ SQUARE FOOT OF CLEAR AREA =, PUSHING. APPLY FLASHING TAPE OVER THE DIAGONAL CUTS. 11. INSTALL THE METAL HEAD FLASHING AND WOOD TRIM. CO m
<br /> CLEAN STONE 6"ABOVE PIPE •18��E:4' rr' PER 150 SF.PROVIDE VENTS ,-,r-1 10. INTERIOR SEAL-LOOSELY PACK THE SPACE BETWEEN THE SND AND THE DOOR UNIT HEAD AND JAMBS O N
<br /> WRAPPED N FILTER CLOTH 11W.11. WITHIN 3'OF CORNERS.REFER E ` 12. FOLD DOWN TOP FLM OF WEATHER RESISTANT BARRIER. REMOVE THE PREVIOUSLY APPLIED TAPE HOLDING j
<br /> G.I. SHEET METAL DRIP ' OUTSIDE W�INSULATION. APPLY INTERIOR UNE OF SEALANT OVER BACKER ROD ON HEAD AND JAMBS. THE FLAP OF THE WATER RESISTANT BARRIER AT THE HEAD. ALLOW THE DAP TO LAY OVER THE METAL O
<br /> _f_ . TO SHEET AI.O Q HEAD FLASHING. APPLY DA9HINC TAPE OVER THE DIAGONAL CUTS.
<br /> �j�'c+�r 7L a'A' E., PAN _ - 3/4" COPPER DRIP/ AIR O
<br /> NOTE:ON(T IHR RATED EXTERIOR WALLS r-fit
<br /> ��! .. a PAN AND T&P / 13. INTERIOR SEAL-LOOSELY PACK THE SPACE BETWEEN THE STUD AND THE UNIT WITH INSULATION. APPLY CO
<br /> BETWEEN UNITS PROVIDE 5/8'EXTERIOR '• I"•'�'H,Q' O., APPROVED CLASS I DRAINS TO �� 12" MAX. INTERIOR UNE OF SEALANT OVER BACKER ROD ON ALL FOUR SIDES. lU
<br /> '� N•`• _ OUTSIDE FROM 0
<br /> GYPSUM SHEATHING UNDER"EXTI SIDING �� / VAPOR RETARDER
<br /> FROM FOUNDATION TO ROOF SHEATHING. �. *� -
<br /> II \ '� FLOOR O
<br /> `G7 Ud
<br /> O
<br /> DCALE : NONE OOR INSTALLATION SEQUENCE WINDOW INSTALLATION SEQUENCE
<br /> C
<br /> TYPSCALE : TWALL SECTION SWAYER HEATER INSTALLATION 0
<br /> SCALE : NONE O
<br /> SCALE NONE O
<br /> PRE-MANUFACTURED TRUSSES WI ATTIC VENTILATION IS AT GABLE pgl
<br /> R49 INSULATION TYP. ENDS WITH CONTINUOUS RIDGE
<br /> 1'0" VENT/• STEEL HANDRAIL
<br /> WALL BRACKET WITH
<br /> COMPOSITION SHINGLE 1 1/2"WOOD OR 2X6 BLOCKING
<br /> ROOFING OVER 308 FELT OVER
<br /> PLYWOOD ROOF SHEATHING DUAL PANE / STEEL HANDRAIL
<br /> TYPICAL.U.N.O. - TEMPERED SAFETY OM
<br /> GLASS SLOPED ♦ a m5.9
<br /> PROVIDE VERTICAL SOLID BLOCKING 0 m
<br /> FROM TOP PLATE TO ROOF SKYLIGHT O-Ai /
<br /> SHEATHING-NO VENT HOLES 1 -n� �
<br /> 2X RAFTER TAIL TYP.- '�_= ��`�����"T- / R�MM= ��
<br /> 3 4'PLYWOOD n R-3 co-
<br /> 2X
<br /> SHEATHING => x
<br /> 0 MANUFACTURERED z -+m
<br /> '0,---C''''
<br /> I► = WOOD STAIR TREADS REFER TO STRUCTURAL o z o
<br /> METAL GUTTER TYP.
<br /> TO STAIRDRAWINGFOR STRINGER NG z
<br /> 1X6 OVER 2X8 RAKE FASCIA = VAPOR RETARDER u CONNECTION
<br /> 1X CEDAR SOFFIT a
<br /> HARDY HORIZONTAL SIDING OVER ' 1.11111
<br /> _I`,
<br /> (2)LAYERS 60 MIN.BUILDING PAPER 2X14 FLOOR JOIST
<br /> ON PLYWOOD SHEATHING,TYP. IIA � ENGINEERPER U FLOOR FRAMING
<br /> L=D ' 4X8 SHAPED CURB II 11111
<br /> AT 72"O.C.
<br /> xIBBD. ON CEILING OF
<br /> 2X6 STUDS @ 16"o%W/R-21 BATT I. (1)HR RATED ' ��I ALL USABLE SPACE
<br /> INSULATION W/5/B"GMB TIP. CEILING BETWEEN 5 " UNDER STAIR -
<br /> O STAIR SECTION TIP. gNa
<br /> 1 GARAGE AND a
<br /> �. DWELLING UNIT •� O
<br /> Lt ABOVE U O
<br /> ►. a I- (�� SCALE 7" = T'-0" N14,:.1--
<br /> FINISHFLOOROVER A. 2X6 FRAMING WITH 2.—
<br /> FINISH
<br /> PLYWOOD SHEATHING IIS f C� R-21 BATT INSULATION - �D
<br /> � w 12 • G ��D 0
<br /> P.T.SILL PLATE ' . $ y MANUFACTURERED V
<br /> ,= 6"MIN-THIS WILL aGIRDER BY IPnIII WOOD STAIR TREADS D
<br /> X /
<br /> CONCRETE FOOTING = INCEASE AS THE STRUCTURAL II ' IA
<br /> SEE STRUCTURAL z = GARAGE FLOOR SLOPES ENGINEER OR TRUSS
<br /> E MFR
<br /> 4"0 PERF.DRAINAGE PIPE W/3/4' - OOD
<br /> to
<br /> !\_ , IY FLOORSHEATHING
<br /> 8,2013I " 61 \ \ YYYCLEAN STONE 6'ABOVE PIPEWRAPPED IN FILTER CLOTH4/�I NnTF.(IN/11HR RATED KXTRKIR WALLS \ . /Cl , 2X14 FLOOR JOIST \AT 7'nr
<br /> Formist,-77JULY
<br /> 0 N
<br />
|