Laserfiche WebLink
DYNASTY EAST DUPLEX , <br /> Minimum Requirement # 2: SWPPP Narrative <br /> Element#1: Mark Clearing Limits <br /> Clearing limits have been shown on the TESC Plan. <br /> Element#2: Establish Construction Entrance <br /> A temporary construction entrance at the location of the existing driveway has been shown <br /> on the SWPPP plan. All vehicles shall be free of debris prior to leaving the site. <br /> Element#3: Control Flow Rates <br /> Flow rates during construction are to be contained through the installation of silt fencing <br /> along the western,northern, and southern clearing limits. <br /> Element#4: Install Sediment Controls <br /> Sediment controls mainly consist of installing silt fencing along the western, northern, and <br /> southern clearing limits. <br /> Element#5: Stabilize Soils <br /> All soils disturbed during site grading will be stabilized by use of the most appropriate <br /> BMP method available. Bare and/or disturbed soils shall remain uncovered and/or <br /> unstabilized for no more than 2 days from October 1 through April 30, and no more than 7 <br /> days from May 1 through September 30. <br /> Element# 6: Protect Slopes <br /> On-site steep slopes lie within the existing stream buffer areas and will be unaffected by <br /> construction activities. <br /> Element#7: Protect Drain Inlets <br /> Culvert inlets downstream of the site along 103rd Street SW will be protected with <br /> triangular silt dams or equivalent. <br /> Element# 8: Stabilize Channels and Outlets <br /> Channels and drainage outlets are not needed around the proposed development area on <br /> site. No stabilization is necessary.Existing channels or drainage outlets located within 500- <br /> feet of the property of the property should be routinely inspected for debris that may dam <br /> and/or aid erosion. <br /> Element#9: Control Pollutants <br /> All pollutants from construction vehicles will be contained and disposed of in the approved <br /> manner consistent with state environmental policies. Any vehicle maintenance will be <br /> performed by authorized mechanics using drip pans and waste containment vessels. All <br /> pollutants will be disposed offsite at approved facilities. <br /> WESTERN ENGINEERS,INC. PROJECT:14-1366-A EAST <br />