Laserfiche WebLink
Erosion Control Notes: <br /> 1. The contractor shall provide periodic street cleaning to remove any sediment tracked off the site. <br /> 2. The contractor shall perform routine inspection and maintenance of all installed erosion and <br /> sediment control BMPs, especially after storms. <br /> 3. Appropriate measures shall be taken to stop sediments from entering waterways if the proposed <br /> BMPs fail. <br /> 4. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than 2 days from <br /> October 1 through April 30,and for no more than 7 days from May 1 through September 30. <br />