My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4614
>
Resolutions
>
Resolution 4614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 10:30:34 AM
Creation date
3/14/2017 10:30:12 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4614
Date
6/24/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 1999 TO 2004 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN <br /> Interstates and Freeways <br /> Local Access <br /> 1. US 2 Snohomish River Bridge Widening(3rd lane) <br /> 2. I-5 Corridor Improvement Study 1. Annual Street Overlays(citywide) <br /> 3. I-5 Median HOV Lanes(SR 526 to US 2) 2. Neighborhood Traffic Mitigation Projects <br /> and Auxiliary Lanes 3. Boeing Mitigation Park&Ride Lots <br /> 4. I-5/41st Street Interchange 4. Pedestrian Improvements(citywide) <br /> 5. I-5/112th Street SE Interchange 5. 12th Street Sidewalks(Rainier Ave.to Poplar St.) <br /> 6. I-5/US 2 Interchange 6. Madison Street Sidewalks(Highland Dr.to Broadway) <br /> 7. SR 526 HOV Lane(I-5 to 34th Avenue W.) 7. Neighborhood Block Grants <br /> 8. SR 96/1-5 Interchange 8. Traffic Signal Interconnect <br /> 9. SR 526/Hardeson Road Interchange Study 9. Pavement Marking Projects(citywide) <br /> 10. Traffic Signal Improvements(citywide) <br /> Principal Arterials 11. Developer Traffic Signals(citywide) <br /> 12. Hazard Elimination and Safety(HES)Projects <br /> 1. 19th Avenue SE(SR 527; 112th St. SE to 132nd St. SE) 13. Roadway Hazard Elimination Projects(citywide) <br /> 2. East Marine View Drive(North Broadway to I-5) 14. Neighborhood Traffic Studies <br /> 3. Pacific Avenue/BNSF Railroad Overcrossing w/Multi- 15. Northern Extension of Interurban Trail, Stage II <br /> Modal Center connection 16. Riverfront Walkway,Phase II <br /> 4. Evergreen Way(Madison Street to Pecks Drive) 17. Everett Nonmotorized Transportation Projects <br /> 5. Evergreen Way(Pecks Drive to 52nd St. SE) 18. City Entryway Landscaping and Signs <br /> 6. Evergreen Way(112th St. SE to 115th St. SE) 19. Riverside Area Street Improvements <br /> 7. Evergreen Way(115th St.SE to Airport Road) 20. Neighborhood Street Improvements <br /> 8. Evergreen Way(47th St.to 41st St.) 21. 3rd Avenue SE(92nd St.SE to 95th St.SE) <br /> 9. 41st Street (Friday Ave.to Rucker Ave.) <br /> 10. Broadway Corridor Study Transit <br /> 11. Arterial Needs Studies(Principal,Minor,and Collector) <br /> 12. Airport Road HOV Lanes 1. Bus Replacements(1999) <br /> 13. Paine Field Blvd./SR 525 Corridor 2. Bus Replacements(2001) <br /> 14. Paine Field Blvd.Extension Studies 3. Vehicle Maintenance Capitalization <br /> 15. Evergreen Way/SR 99 HOV Treatments 4. Regional Fare Coordination Project <br /> 16. 19th Avenue SE(SR 527)HOV Treatments 5. Operations Support Vehicle Replacement <br /> 6. Transit Op.&Maint.Facility Siting Study <br /> Minor Arterials <br /> HOV Projects <br /> 1. 38th Street Railway Overcrossing and Riverside Pkwy <br /> 2. 112th Street SE(SR 525 to SR 527) 1. Everett Station(Multi-modal Center)Phase II-PS&E;R/W <br /> 3. 100th Street SE(SR 527 to 35th Ave. SE) 2. Everett Station(Multi-modal Center)Phase II-R/W <br /> 4. 4th Avenue West(Holly Dr.to 88th St. SW) 3. Everett Station(Multi-modal Center)Phase III-Constr. <br /> 5. 100th Street SW(Evergreen Way to Airport Rd.) 4. Everett Station(Multi-modal Center)Commuter Rail <br /> 5. South Everett Transit Center Design-Sec.9 <br /> Collector Arterials 6. South Everett Transit Center Design(Sound Transit) <br /> 7. South Everett Transit Center Right-of-Way-(Sound Transit) <br /> 1. 36th Street Park&Ride Lot and Access Improvements 8. South Everett Transit Center Construction-CMAQ <br /> 2. 75th Street(Beverly Lane to Beverly Blvd.) 9. South Everett Transit Center Construction-Sec.9 <br /> 3. 37th Street(Rucker Ave.to Broadway) 10. South Everett Transit Center Construction-(Sound Transit) <br /> 4. California Street Overcrossing(Everett Ave.Extension) 11. North Everett Transit Center-PS&E Design-(Sound Transit) <br /> 5. Holly Drive(92nd St.SW to Southern City Limits) 12. North Everett Transit Center Design-Sec.9 <br /> 6. Everett Avenue BNSF Overcrossing to Railway Ave. 13. North Everett Transit Center Construction-Sec.9 <br /> 7. 52nd Street SE(Colby Avenue to Evergreen Way) 14. North Everett Transit Center Construction-(Sound Transit) <br /> 8. 16th Street(Maple St.to Walnut St.) 15. Expanded City Rideshare Program(MOVE) <br /> 9. 10th Street(Pine St.to East Marine View Drive) 16. Implementation of State CTR Law <br />
The URL can be used to link to this page
Your browser does not support the video tag.