Laserfiche WebLink
Clalm summary 6om Newland Development Co <br />11/14/13 <br />Flood Damage as a result of heavy relns: <br />August 29th, 2013 <br />2907 Hewitt <br />2911 Hewitt <br />Carpet 2,178.55 replaced 1/2 of space for area damaged <br />Carpet clean 325.36 cleaned 1/2 soiled by tracking <br />flood clean SS evening of flood <br />Doleatti Clean 100 evenfng of tlood <br />2.688.93 <br />flood dean <br />Dolealti Clean <br />2915 Hewitt (tood dean <br />Bayside supply <br />Doleatti Clean <br />A Advanced Carpet <br />85 evening of flood <br />100 evening after tlood <br />185.00 <br />145 eveniog of flood <br />182.54 cave base reinstall <br />201.77 evenlnq of ilood <br />2264.99 dehrt�idifiers and clean <br />2 794.30 <br />Total Hewitt Cost 5 668.23 <br />