Laserfiche WebLink
Date z z� �8 <br />PUBLIG <br />Print or Type Only <br />ApplicaliontFor <br />WO R I�S <br />0 <br />0 <br />PERMIT <br />Pubbc N'orASlce <br />,o�r� F„� s _ <br />ii � <br />! .i <br />Describe Proposed Work 1_ , �) � r��� �� �n� -�� ~� — � n LOQLlS <br />?�� '— �nn VLrt! S _ <br />Attach four (4) copies of plans for proposed work - Drav <br />• Property Lines <br />• Outline and dimensions o1 ali existing and <br />proposec structures on Ihe lot <br />• Existing and proposed utilities <br />• Centerlme of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />PERMIT CONDITIONS <br />t. All cells lor ��spection shell be made 24 hrs. in advance - phone 259•8870. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards end Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1•800-424-5555. <br />I(o� // <br />�/f rX <br />��.(/r <br />�� <br />ApprOvetl lor l:onsiruClion � ya�� <br />---_-!~v,� -����� a.si� �f <br />f1FJAL INSPECTION �� �e <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />� 3200 Ceder Street <br />Evere�t, WA 99201 <br />Phone: 259•B810 <br />The undersigned ow�er/applicant hereby agrees to hold �nd save harm� <br />less ihe Ci1y ol Everelt irom any and all claims tor damages, cos�s. <br />ezpenses. or causes of action that may a�ise because of installation <br />and mainlenance ol Iha improvement or other righ4ol�way use hereto <br />applled lor and further agrees to remove same upon notice Irom Ihe <br />Cily and to replace public property damaged thareby. <br />�.�.,_`D� %�.:.� /z-/�- �b <br />Si9nalure ol Applican Date <br />WORK AUTHORI2ED BY THIS PERMIT MUST 8E STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILICiENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON hNY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />