My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2236-97
>
Ordinances
>
Ordinance 2236-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 9:39:39 AM
Creation date
3/16/2017 9:39:38 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2236-97
Date
8/13/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oeb/14 <br /> OW <br /> Eczn , <br /> ORDINANCE NO. 2 2 3 6—9 7 <br /> AN ORDINANCE creating a special improvement fund entitled <br /> "Marine View Drive, Alverson Bridge to North Broadway", <br /> Fund 305, to accumulate all costs for the improvement project <br /> and repealing Ordinance 2040-95. <br /> WHEREAS, the City of Everett is committed to street widening, drainage, pedestrian, bicycle <br /> and traffic improvements on Marine View Drive between Alverson Bridge and North <br /> Broadway; and <br /> WHEREAS, this project is part of the planned improvements to Marine View Drive and the <br /> City of Everett has received State Grants, Federal Grants, and other funds for these <br /> improvements; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 305, "Marine View Drive, <br /> Alverson Bridge to North Broadway" to accumulate all costs for the improvement project and <br /> repealing Ordinance 2040-95. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 305 for <br /> design and construction of the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Engineering/Public Services Director", under <br /> direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of $3,151,930.00 is hereby appropriated to Fund 305, "Marine View Drive, <br /> Alverson Bridge to North Broadway" as follows: <br /> A. Estimated Project Costs <br /> Design $ 251,477 <br /> Right-of-Way $ 120,800 <br /> Construction $ 2,779,653 <br /> Total Estimated Cost $ 3,151,930 <br />
The URL can be used to link to this page
Your browser does not support the video tag.