My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2196-97
>
Ordinances
>
Ordinance 2196-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 11:08:02 AM
Creation date
3/16/2017 11:07:56 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2196-97
Date
1/15/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O. EROSION AND SEDIMENT CONTROL REQUIREMENT #14: <br /> Maintenance <br /> All temporary and permanent erosion and sediment control BMPs shall be <br /> maintained and repaired as needed to assure continued performance of their intended <br /> function. All maintenance and repair shall be conducted in accordance with the City of <br /> Everett's Stormwater Management Manual and Design and Construction Standards and <br /> Specifications. <br /> All temporary erosion and sediment control BMPs shall be maintained in a <br /> satisfactory condition until such time that clearing and/or construction is completed, <br /> permanent drainage facilities are operational, and the potential for erosion has passed. <br /> As construction progresses and seasonal conditions dictate, the erosion <br /> control facilities shall be maintained and/or altered as required by the City Engineer to ensure <br /> continuing erosion/sedimentation control. <br /> P. EROSION AND SEDIMENT CONTROL REQUIREMENT #15: <br /> Financial Liability <br /> To the extent permitted by law, performance bonding, or other appropriate <br /> financial instruments acceptable to the City, shall be required for all projects to ensure <br /> compliance with the approved erosion and sediment control plan. <br /> (5) MINIMUM REQUIREMENT #2: PRESERVATION OF NATURAL <br /> DRAINAGE SYSTEMS <br /> Natural drainage patterns shall be maintained, and discharges from the site shall occur at the <br /> natural location. <br /> (6) MINIMUM REQUIREMENT #3: SOURCE CONTROL OF POLLUTION <br /> Source control BMPs shall be applied to all projects to the maximum extent feasible. <br /> Source control BMPs shall be selected, designed, and maintained according to the City of <br /> Everett Stormwater Management Manual. <br /> CSIAGORD:STORM.ORD(LM9/27/96) <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.