Laserfiche WebLink
development will not cause a recurrence of the problem nor the occurrence of any new <br /> drainage-related problem. The City Engineer may also designate as critical any area in <br /> which comparable problems would occur in the future due to any increase in volume or peak <br /> discharge. The requirements of this section shall apply regardless of any other City <br /> regulation. Where applications of the provisions of this section will deny all reasonable use <br /> of the property, the restrictions on development contained in this section may be waived for <br /> the subject property, provided that the resulting development shall be subject to all the <br /> remaining terms and condition of this ordinance. All decisions based on the provisions of <br /> this section shall be compatible with the comprehensive drainage plan for the basin in which <br /> the subject property is located. For development in areas designated as critical, the <br /> developer shall provide information regarding volume and rate of discharge for a range of <br /> storms as specified in the procedures manual. <br /> SECTION 5: CITY ENGINEER REVIEW AND APPROVAL OF REQUIRED PLANS <br /> All plans prepared in connection with this ordinance shall be submitted for review <br /> and approval by the City Engineer. <br /> SECTION 6: ESTABLISHMENT OF REGIONAL FACILITIES <br /> In the event that public benefits would accrue due to modification of the drainage <br /> plan for the subject property to better implement the recommendations of the basin plan, the <br /> City Engineer may recommend that the City should assume responsibility for the further <br /> design, construction, operation and maintenance of the drainage facilities, or any increment <br /> of the responsibility of the facilities on the subject property. Should establishment of a <br /> regional detention facility at a location not contained in the subject property entail a greater <br /> public benefit, the City Engineer may require the developer to participate in the cost of such <br /> an off-site regional detention facility in lieu of constructing on-site detention facilities. Such <br /> decision shall be made concurrently with review and approval of the plan as specified in this <br /> ordinance. In the event that the City decides to assume responsibility for all or any portion <br /> of the design, construction, operation and maintenance of the facilities, the developer will be <br /> required to contribute a pro rata share to the construction cost of the facilities. The <br /> C STAGORD:STORM.ORD(LM9/27/96) <br /> 18 <br />