Laserfiche WebLink
SR 526 SU.NLMAR1.OF PROJECT TASKS <br /> NOTE:Refer to the complete Contract Documents for the <br /> project description. <br /> - BOEING I.CHANNELIZATION IMPROVEMENTS <br /> '. <br /> EVER E TT RESTRIPE AND REBUITON SEAWAY BLVD.FROM FLUKES <br /> STRIPING PROJECT ENDS PLANT MAIN ENTRANCE TO AND INCLUDING THE INTERCHANGE WITH <br /> S.R.526.USE THE EXISTING CHANNELIZATION ASA GUIDE FOR <br /> • 1 1 r AT RAMP ENTRANCE •,-_ _ INSTALLING THE NEW CHANNELIZATION.THIS RESTRIPING <br /> • __ SHALL BE PERFORMED USING HOT THERMOPLASTIC STRIPES <br /> L } ,. AND RAISED PAVEMENT MARKINGS AS DESCRIBED IN THE <br /> _ ��. . CONTRACT DOCUMENTS.WHERE NECESSARY FOR PROPER <br /> _-�I — - INSTALLATION,THE EXISTING MARKINGS SHALL BE REMOVED <br /> 1• <br /> �_ '••l ..--�-tr• - PRIOR TO RESTRIPING. <br /> I r nk:-' ' .! ' f I mi 1 I.I. •• FLUKE 2.ROADSIDE ENHANCEMENTS <br /> _ �, ( Lt - y - A.REPLACE MERGE-DIVERGE END TREATMENT PER THE <br /> - y - --- PARK ATTACHED STANDARD PLANS AND AS DIRECTED BY THE <br /> ENGINEER <br /> I B.RELOCATE THE THREE EXISTING STREET LIGHTS 20 FEET <br /> 2A :3_,,,, i' <br /> B L- 4.:. <br /> BEHIND THE FOG LINE AND ON INE OTHER SIDE OF THE <br /> \* - �• LIQ - - EXISTING DITCH.AS DESCRIBED IN THE CONTRACT DOCUMENTS <br /> \ \ - SEAWAY BLVD. " , ?2C I /r AND AS LOCATED IN THE FIELD BY THE ENGINEER. <br /> • <br /> \\1 ! 1 . ( C.REMOVE AND REPLACE THE GUARDRAIL ON BOTH <br /> - +• , _ % z • <br /> APPROACHES TO THE BOEING ACCESS OVER CROSSING AS <br /> �• <br /> r, ,:,:v.....-,..-...-...;',46.:111.1,.' t,�; /,/ r• 1 C 1 -•4 DESCRIBED IN THE CONTRACT DOCUMENTS AND AS LOCATED IN <br /> \ .,; THE FIELD BY THE ENGINEER. <br /> h � <br /> V. �, - -� ___ �•,_�Y 3,STREET LIGHTING INSTALLATION <br /> 1 - - - _ INSTALL FOUR STREET LIGHTING LUMINAIRE POLES 30' <br /> ✓ 4 - —. - --� -.— _ - -. AND ARMS 110'1 ALONG THE NORTHBOUND BOEING ACCESS <br /> x <br /> i7 .,RAMP OF SEAWAY BLVD.THEY SHALL BE LOCATED AT LEAST 3 <br /> - - _ FT BEHIND THE EXISTING CURB AND AS LOCATED IN THE FIELD <br /> 3• <br /> 4A BY THE ENGINEER ALSO,INSTALL FOUR WALL PACK <br /> GI <br /> I - — �� STRIPING PROJECT BEGINS LUMINAIRES IN THE UNDER CROSSING OF SEAWAY BLVD AS <br /> - 1 / - • AT INTERSECTION DESCRIBED IN THE CONTRACT DOCUMENTS,AND AS LOCATED <br /> 1 3 IN THE FIELD BY THE ENGINEER. <br /> SA SB .2C,: L - <br /> 1, I \ i' i 'Nk."' I STREET IMPROVEMENTS <br /> _\ { • \. t ` i _ • A.CONSTRUCT APPROXIMATELY'240 FEET OF CURB, <br /> • .\ I I I GUTTER AND 5 FOOT WIDE SIDEWALK AND DRAINAGE <br /> \\\ <br /> 3d IMPROVEMENTS ALONG THE EAST SIDE OF SEAWAY BLVD AT <br /> { '� NORTH PERIMETER ROAD AS DESCRIBED IN THE CONTRACT <br /> <, II �; DOCUMENTS AND AS LOCATED IN THE FIELD BY THE ENGINEER.i \\ . <br /> B.CONSTRUCT APPROXIMATELY 400 FEET OF CURB, <br /> GUTT <br /> �_ 75TH ST SW ER AND 5 FOOT WIDE SIDEWALK ANDDRAINAGE <br /> • IMPROVEMENTS ALONG THE EAST SIDE OF SEAWAY BLVD <br /> I 1 ! 16.5 ft SOUTH OF 75TH STREET SW AS DESCRIBED IN THE CONTRACT <br /> 8 ft DOCUMENTS,AND AS LOCATED IN THE FIELD BY THE ENGINEER. <br /> 5.PERMENENT SIGNING <br /> 10" Let. Boeing A REMOVE EXISTING OVERHEAD SIGN AND INSTALL A <br /> i •3 ' I <br /> 13" Let' BoeingParkin NEW OVER HEAD GUIDE SIGN PER DETAIL SA AND DESIGNED IN <br /> g 10" Let. Visitors ACCORDANCE WITH THE WSDOT SIGN FABRICATION MANUAL <br /> 1 8 ft AND WSDOT/APWA STANDARD PLAN G-6,USING TYPE*E" <br /> t,.«. 10" Let. Visitors Employees 10 ft MODIFIED LETTERS. <br /> L.I. B:INSTALL A NEW ROAD SIDE DUAL POST MOUNTED GUIDE <br /> 8" Let. t t A EXIT ONLY x»�o»—n.,x� SIGN PER DETAIL 5B AND DESIGNED IN ACCORDANCE WITH THE <br /> i 1 r WSDOT SIGN FABRICATION MANUAL AND PER WSDOT/APWA <br /> I 1 STRIPING PROJECT ENDS \ .4.4.4.444,........4444,4444.4“44.4,..... TIMBER POSTS,ASCLOCAa. TED IN THEE SIING TYPE'E"DEBE THE ODIFIED LETTERS <br /> NEER D <br /> SR 526 AT RAMP EXITDetail 5B <br /> Detail 5A <br /> I <br /> I <br /> __ _. 444..4,a /• CITYSEAWAY BLVD.IMPROVEMENT o.-. 1 <br /> 1 1-—_ ._.. ? OF EVERETT PROJECT SUMMARY PICTURE <br /> j --- ...•,,,,�,,,,, �--'•VEP's PUBLIC WORKS DEPARTMENT PROJECT �I/ <br /> II f x vxE n. e, 6 <br />