My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feeney Wireless, LLC 2/16/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Feeney Wireless, LLC 2/16/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 2:40:09 PM
Creation date
3/16/2017 2:40:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Feeney Wireless, LLC
Approval Date
2/16/2017
End Date
12/31/2018
Department
Telecommunications
Department Project Manager
Jeannette Postma
Subject / Project Title
Network Architecture Design & Implementation
Tracking Number
0000522
Total Compensation
$45,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> Assist with network architecture assessments,design and deployment. <br /> Network Planning and Design: The network planning phase will initiate the project,solidifying the project frame <br /> work and strategic direction.This will include needs analysis and requirements gathering, confirming the current"as- <br /> is"environment capabilities,limitations,stakeholders,resources and vendors.Additionally,it will serve to identify <br /> the to-be environment and preliminary work breakdown necessary to acquire accurate information,specifications, <br /> partnerships,authorizations,and procurement of necessary products,services,and interagency data sharing. <br /> Activities may include but are not limited to: <br /> • Information gathering—Including work with City of Everett IT and equipment vendor for design and <br /> configuration <br /> • Network design and documentation—including Network drawing <br /> • Configuration&testing the communication between Master and Remote <br /> • Trouble shooting any problems(One SIM card with FW for remote trouble shooting) <br /> Implementation&Documentation <br /> Provide project management oversight for the implementation.An incremental approach will ensure that solutions <br /> implemented are reliable and stable. Detailed documentation of the deployment information,such as IP,device, <br /> location information. <br /> Activities may include but are not limited to: <br /> • Network Documentation—All sites:IP address/site name/device serial number/IMEI/MTN/Subnet <br /> • Database creation and update will greatly reduce the time in the future for repair/trouble shooting/RMA and <br /> asset management <br /> • Work with FW production to load correct template for all modems with latest firmware <br /> • Shipping handling including labeling all shipping boxes and devices for easy identification <br /> • Knowledge transfer including template deployment,report gathering,monitoring the device,how to use <br /> portal,administration of the device portal <br /> • Trouble shooting if any problem <br /> • Project Sign off on acceptance <br /> Page 13 <br /> Feeney Wireless 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.