Laserfiche WebLink
� <br />CLOSED CAI 110R1C O*.u8R8 REPORT <br />Total Utility Maintenance Management System <br />O1/02/1997 Page 1 <br />-------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------- <br />Date Range :01/09/1989 - 12/31/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101186649214 <br />Item Ranqe :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL • <br />-------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 71011R6649214 Title: SO 1 INCH #5 LINE 665 + 75 - NORTH <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Proqram 710 Functian 118 Activity 664 <br />Date Completed: 12/05/1996 <br />Overall Craft: <br />Issued: il/16/1996 Issued by: CAG Assigned to: NSO <br />Out of Servica? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />, Labol: <br />Craft ID Name Planned Hrs Actual Hrs <br />----- ------ ------------------------------ ----------- ---------- <br />� WST NSO NIEISEN, SCOTT O. 0.00 12.00 <br />xat�riaiss <br />ID <br />ADAP36001247 <br />BOX000043547 <br />BOX000044647 <br />BOX000056047 <br />BUSH36065047 <br />ELL036144047 <br />EXTE64146947 <br />METE36089247 <br />N/A <br />N/A <br />N/A <br />PIPE36060747 <br />PIPE44304247 <br />SETT36033547 <br />VALV38034348 <br />vahicles: <br />ID <br />V2151 <br />Description <br />------------------------------ <br />ADAPTER 1" MIP X INSTA-TITE @ <br />SOX VALVE 18" CI TOP&LID ONLY <br />ROX VALVE 5' PLASTIC <br />BOX METER PLA 13" X 20" W/LID <br />BUSHING 2" X 1° BRASS " <br />ELL 1" 90 DEG STREET BRASS " <br />EXTENSION 48" VALVE STEM <br />METER 1" NEPTUNE T-10 <br />TRACING WIRE <br />TOP COARSE <br />DELINEATOR <br />PIPE 1" POLY I.P.S. <br />PIPE 6" PVC SEWER <br />SETTER COP 1" (H15") <br />VALVE GATE 2" SUPER HEAVY DUTY <br />Description <br />----------------------- <br />86 CHEV 1 TON HYD. UNIT <br />Cost <br />222.96 <br />Total Labor Cost: 222.96 <br />Date �{ Used Cost <br />-------- -------- ---------- <br />11/13/1996 2 23.80 <br />11/13/1996 1 16.88 <br />11/13/1996 1 33.19 <br />11/13/1996 1 21.56 <br />11/13/1996 1 4.33 <br />11/13/1996 2 5.42 <br />11/13/1996 1 46.38 <br />11/13 1996 1 82.79 <br />11 13/1996 0 6. <br />11/13/1996 15 208.20 <br />11/13/1996 1 12.00 <br />11/13/1996 55 1.45 <br />11/13/1996 13 16.64 <br />11/13/1996 1 93.38 <br />11/13/1996 1 91.46 <br />Total Material Cost: 684.08 <br />� � <br />Hours Cost `� �• a� <br />-- --- ---------- <br />12.00 61.20 <br />Total Vehicle Cost: 61.20 <br />