My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/01 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 8:39:24 AM
Creation date
3/17/2017 9:06:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/1/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />FINAL CONTRACT VOUCHER CERTIFICATION <br />CONTRACTOR:Schwetz Construction ADDRESS: PO Box 615 <br />CITY: Sedro Woolley STATE: WA 98284 DATE: March 24, 1998 <br />PROJECT TITLE: 7` Av. SE Sidewalk/Bicycle Improvements WORK ORDER NO. PW3194 <br />DATE WORK COMPLETE: June 28, 2007 FINAL AMOUNT: $ 424,397.59 <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br />and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br />authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br />employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br />monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br />understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br />whic may have, arising out of the performance of said contract, which are not set forth in said estimate. <br />X ---����:,Fiti1 <br />CONTRACTOR'TLEsK' <br />, <br />NI <br />Schwetz Construction = G_� pTA,p�.,� <br />Subscribed and sworn Lo before i 's <br />methis ay of t o2,27 <br />X Notary Public <br />in and f9f the State of g Washington, residing at of <br />g �w^s <br />PUBLIC WORKS DEPARTMENT CERTIFICATION <br />I Certify the attached final APPROVED Date: �rZ-�27 <br />estimate to be based upon actual <br />measurements and to be true and correct. <br />X X <br />Construction Manager Utilities Director <br />Tom Fuchs Tom Thetford <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br />agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br />attached. <br />Revised 9/94 <br />�i <br />
The URL can be used to link to this page
Your browser does not support the video tag.