My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/15 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:25:14 AM
Creation date
3/17/2017 9:24:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n P? PT CI&COT..Tl L A TE)u1 ® Rfi SflBl T <br /> C <br /> PROJECT TITLE: <br /> Professional Services Contract Consent COUNCIL BILL# <br /> with Cosmopolitan X Action Originating Department Public Works <br /> Engineering Group for Lake First Reading Contact Person Robert Waddle <br /> Chaplain Reservoir Water Second Reading Phone Number 8927 <br /> Intake and Outfall Project Third Reading FOR AGENDA OF Aug 15, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA y0.1 <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filtration Plant Budget Comm 8-8-07 Contract Legal: Standard PSA <br /> language not amended. <br /> Amount Budgeted $200,000 <br /> Expenditure Required $120,000 Account Number(s):401-5-200-121-923-410 <br /> Budget Remaining $80,000 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> A professional services contract is required for lake studies and design services for needed improvements to <br /> the intake pipelines and recovery water discharge in the Lake Chaplain Reservoir located at the City of <br /> Everett's Water Filtration Plant. The project will be conducted in three phases including planning/predesign, <br /> design and construction management. This project is required to ensure that the plant recycle water does not <br /> mix with plant intake water and interfere with treatment. Cosmopolitan Engineering Group was selected for <br /> this work based on their level of experience and expertise in outfall design and water body modeling. They <br /> have successfully completed several major design and modeling projects for the City's Water Pollution <br /> Control Facility. Their work is highly respected in the industry and with the regulatory agencies. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with the City of Everett and Cosmopolitan <br /> Engineering Group in the amount of$120,000 to conduct hydraulic studies and design new water intake and <br /> outfall systems in the Lake Chaplain Reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.