My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/15 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:25:14 AM
Creation date
3/17/2017 9:24:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> 1. Work to Be Performed <br /> Conduct studies,design and construction management for proposed improvements to the intake pipelines and <br /> recovery water discharge at the City of Everett water filtration plant. The project will be conducted in three phases <br /> (planning/predesign,design and construction management)as described below. The basis of this proposal is for the <br /> following two capital improvement projects at Lake Chaplain,which may be designed and constructed separately or <br /> jointly: <br /> • Extension of the existing twin gravity intakes from approximately 30 foot depth to approximately 60 foot <br /> depth(length 500 to 1,000 lineal feet),and <br /> • Extension of the recovery water discharge outfall(length up to 7,000 lineal feet)into Lake Chaplain. <br /> These intake and outfall extension projects would be constructed of HDPE pipe with bolt-on precast concrete <br /> anchors. <br /> PLANNING/PREDESIGN <br /> Design Criteria <br /> The City of Everett would furnish the following design information: <br /> • Design flow rates for the gravity intake lines and the recovery water discharge <br /> • Lake Chaplain inflow and outflow design criteria <br /> • Hydraulic design criteria(pump data,allowable HGL,Lake Chaplain water surface elevations) <br /> • Requirements for intake screening or configuration <br /> • Record drawings for gravity intakes,siphon intake and recovery water piping <br /> • UW reservoir analysis and bathymetric data. <br /> Field Studies <br /> The following field activities will be conducted in support of the planning and design tasks. <br /> • • UW bathymetry will be used for planning and design. Final bathymetry will be obtained by the contractor <br /> prior to construction and for record drawings. <br /> Two ADCP current meters will be placed in Lake Chaplain from mid-August through September. The <br /> locations will be approximately 2,000 feet on either side of the point of inflow to Lake Chaplain,in approximately <br /> 60 feet of water. Each meter will be set to record current velocity at 10 minute intervals in 5-foot depth bins. The <br /> meters will be anchored with precast concrete weights,ground lines and surface floats. The City of Everett boat and <br /> operator will be used for the deployment and recovery of the meters. <br /> • Wind speed and air temperature will be monitored continuously by City of Everett at a station near the top <br /> of the levee during the current meter deployment. <br /> • City staff will measure water temperature profiles at six stations spaced along the axis,twice weekly during <br /> the current meter deployment. <br /> • Side scan sonar and subbottom and seismic profiling will be conducted along the axis of the lake. This <br /> work will be staged from the City of Everett boat(with operator). The product of the side scan will be a surficial <br /> features map(analogous to an aerial photograph),and the product of the subbottom and seismic profiling will be to <br /> map surficial sediment thicknesses and engineering properties. <br /> • The existing twin gravity intakes will be inspected and videotaped by divers. Inflow shall be shut down <br /> during this dive. The City shall provide staging for the dive from their vessel. <br /> • An inspection dive of the current meter anchors shall be conducted. The purpose of this dive shall be to <br /> inspect the current meter mooring and determine soil bearing and settlement criteria from the concrete anchors(to be <br /> used in design of the pipeline anchors). The City shall provide staging for the dive from their vessel. <br /> r3 <br /> Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.