My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/15 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:25:14 AM
Creation date
3/17/2017 9:24:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 3 <br /> Amendment No. 1 to Consent COUNCIL BILL#. <br /> Professional Services X Action Originating Department Public Works <br /> Agreement between the City of First Reading Contact Person Dave Davis <br /> Everett and Perteet,Inc. for a Second Reading. Phone Number (425) 257.-8913 <br /> reduction in the amount of Third Reading FOR AGENDA OF <br /> $350,000.00. Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President ) <br /> Location Preceding Action Attachments Department(s)Approval <br /> Riverfront Development 4/25/07 Agreement Amendment No.1 <br /> executed with Perteet, <br /> Inc. <br /> Amount Budgeted $2,500,000.00 <br /> Expenditure Required ($350,000:00) Account Number(s): Fund 308 <br /> Budget Remaining $2,150,000.00 <br /> Additional Required - 0.- <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett entered into an agreement with Perteet, Inc., On April.25, 2007., to.design the Riverfront <br /> civil projects,including an access bridgeinto the Simpson site, HDR wasproposed as a subcontractor for <br /> Perteet to provide the pre-design, design, and construction support for the bridge. Currently, contract issues <br /> exist between the two firms,preventing HDR from signing their sub-consultant agreement with Perteet for <br /> the bridge design. HDR was the designer for the adjacent 41St Street Overcrossing project and has completed <br /> studies for the proposed Simpson access bridge. City staff is recommending the bridge design be removed <br /> from Perteet's agreement and added to the agreement with HDR for other Riverfront-related work. Both <br /> firms agree Amendment No. 1 will give City staff direct control of the bridge design and will allow the <br /> design to proceed without further delay. Amendment No. 1 will decrease the existing agreement with Perteet <br /> by$350,000.00. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to Professional Services Agreement between the City of <br /> Everett and Perteet,Inc. for a reduction in the amount of$350,000.00. <br /> 5 <br /> Riverfront-Perteet GECM Amend No 1.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.