My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/08/29 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/08/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:54:15 AM
Creation date
3/17/2017 9:53:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EVERETT CITY COUNCIL A6EN1)4,,ITN COVER SHEET <br /> PROJECT TITLE: <br /> Professional Services Consent COUNCIL BILL# <br /> Agreement with Murray, Smith X Action Originating Department PW/Utilities <br /> & Associates, Inc. to complete First Reading Contact Person David Voigt V <br /> engineering services for the Second Reading Phone Number 425-257-8983 <br /> Sewer Lift Station No. 24 Third Reading FOR AGENDA OF August 29, 2007 <br /> Replacement Project Public Hearing <br /> Initialed by: <br /> Department ,Heap��� 0 <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> South Everett (not in Budget Corn. August 22, Professional Services Legal <br /> City limits), see attached 2007 Agreement with Exhibits <br /> project location map and Attachments including <br /> Scope of Work, Project <br /> Location Map, <br /> Subconsultant proposals, <br /> Budget Estimates <br /> Amount Budgeted $240,000 <br /> • <br /> Expenditure Required $202,116 Account Number(s): UP 3313 <br /> Budget Remaining $37,884 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Assessment of this sewer lift station has determined that it has reached the end of its useful service life and <br /> should be replaced soon. This project is identified in the City of Everett Final 2006 Comprehensive <br /> Sewer Plan as Capital Project SE7-15. A majority of the existing facilities will be removed and replaced <br /> with new structures and equipment. This sewer lift station is located at 12,000 Silver Way (west of I-5 <br /> near 120'h St SE). <br /> Murray, Smith & Associates, Inc. (MSA) was selected from the roster to provide professional engineering <br /> and design services: This preliminary design effort will identify, evaluate and make recommendations for <br /> technical options and alternatives, permitting constraints and other factors that require decisions by the <br /> City prior to undertaking detail design. Detail design is scheduled for 2008 and construction is anticipated <br /> to occur during 2009 and 2010. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign a Professional Services Agreement with Murray, Smith & Associates, Inc. for <br /> engineering services for Sewer Lift Station No. 24 Replacement project in the amount of$202,116. <br /> S:\DVoigt\Litt Sta 24_MSA_UP3313'`\Council and Bdgt Com LS#24 Rplcmt_MSA PSA Cicl Agenda Cover.DOC 2 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.