Laserfiche WebLink
EXHIBIT D-PROJECT SCHEDULE 4 <br /> PRELIMINARY DESIGN <br /> LIFT STATION NO.24 REPLACEMENT PROJECT <br /> CITY OF EVERETT WORK ORDER No.UP 3313 <br /> Tasks 7112A975s8t112sn9s/21S9elp2t1e979b9e/r169/239/030etloobner0/1 0/210/2Nlovve4mvblerlii111121p1vec2e1mvb9er2/112/212;13arvu6a711311201127F1 veb3ruvaD72/172/2,11M372rc3hi, <br /> Task 1 Project Management <br /> Task 2 Information and Data Gathering <br /> Task 3 Design Criteria Development <br /> Draft Technical Memorandum • 10/12 <br /> Workshop Meeting • 10/24 <br /> • Final Technical Memorandum • 11/2 <br /> Task 4 Concept Development and Evaluation <br /> Draft Technical Memorandum • 11/30 <br /> Workshop Meeting • 12/12 <br /> Final Technical Memorandum • 12/21 <br /> Task 5 Surveying and Mapping <br /> Task 6 Geotechnical Investigations <br /> Draft Geotechnical Report • 1/4 <br /> Final Geotechnical Report • 1/25 <br /> Task 7 Preliminary Design Report <br /> Draft Design Report • 2/4 <br /> Final Design Report • 2/29 <br /> Task 8 Unanticipated Labor or Expenses <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC. LS 24 Predesign <br /> August 2007 Engineers/Planners Exhibit D-Project Schedule <br /> WPDX.FILODUMAClieets Ever.,WAAL.5.... N.24Trt-Llesign,ScheAule/1.607 mpy• <br />