My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/09/09 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/09/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 10:13:39 AM
Creation date
3/17/2017 10:13:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Change Order#1 with Consent COUNCIL BILL# <br /> Strider Construction for the X Action Originating Department Public Works <br /> Sewer System Replacement First Reading Contact Person Tom Fuchs <br /> "F", Schedule C project. Total Second Reading Phone Number 425-257-8931 <br /> Amount of Change Order#1: Third Reading FOR AGENDA OF Sept. 19, 2007 _ <br /> $309,436.00 and 20 additional Public Hearing <br /> working days. Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Vicinity Map Bid: 2/27/2007 Change Order#1 Public Works <br /> Award: 3/28/2007 <br /> Budget Committee: <br /> 9/12/2007 <br /> Amount Budgeted $ 1,221,839.00 <br /> Expenditure Required $1,531,275.00 Account Number(s): UP3300-3 <br /> Budget Remaining $ -0- <br /> Additional Required $ 309,436.00 <br /> DETAILED SUMMARY STATEMENT: <br /> City contracted with Strider Construction for the Rucker Hill sewer system replacement"F"Project, <br /> Schedule C. Change Order#1 is required to extend the contract and to provide for some additional concrete <br /> work. Change Order#1 is written in the amount of$309,426.00 to cover the cost to construct concrete road, <br /> curbs, sidewalks and driveways in the 3300 and 3400 blocks of Kromer and to extend the contract for 20 <br /> additional working days. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#1 for the Sewer System Replacement"F", Schedule C project <br /> with Strider Construction in the amount of$ 309,436.00 and to extend the contract 20 additional working <br /> days. <br /> 3 <br /> C:\Documents and Settings\SuClark\Desktop\New Folder&Agenda Cover-CO DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.