My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/09/25 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/09/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 10:36:28 AM
Creation date
3/17/2017 10:35:47 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 6 <br /> Amendment No. 1 to the Consent COUNCIL BILL# <br /> Professional Services X Action Originating Department PW/Utilities <br /> Agreement with URS First Reading Contact Person David Voigt <br /> Corporation to complete Second Reading Phone Number 425-257-8983 <br /> engineering services for the Third Reading FOR AGENDA OF September 26, <br /> Sewer System Capacity 2007 <br /> Improvements "J" Project Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA rf!. <br /> Council President f'i <br /> Location Preceding Action Attachments Department(s) Approval <br /> North Everett, see PSA and funding for Exhibits and Attachments: Legal <br /> attached project location predesign services,August Scope of Work,Project <br /> map 2, 2006,Bdgt Corn. Location Map, Schedule, <br /> September 12,2007 Subconsultant proposals, <br /> Budget Estimates <br /> Amount Budgeted $400,000 <br /> Expenditure Required $366,159 Account Number(s): UP 3270-2 <br /> Budget Remaining $33,841 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Final 2006 Comprehensive Sewer Plan has identified the need to increase conveyance capacity in portions of the <br /> Hoyt Avenue Interceptor and the 17th Street Interceptor. This project is located in north Everett generally in the <br /> vicinity of Hoyt Ave., between 24th St and 17th St, and 17th St, between Hoyt Ave and Wetmore Ave. Based on the <br /> results a preliminary design study, needed capacity can be attained by constructing approximately 1,875 linear feet of <br /> 18-inch diameter sewer force main pipe on Hoyt Ave between 24th St and 20th St and 750 linear feet of 18-inch <br /> diameter sewer force main pipe on 17th St between Hoyt Ave and Wetmore Ave. Improvements will also include a <br /> special flow control structure at Hoyt Ave. and 20th Street to divert wet weather flows out of the Hoyt Interceptor and <br /> into the existing 36-inch diameter main on 20th St. <br /> In August 2006, URS Corporation was selected to provide professional engineering and design services and in July <br /> 2007 did complete a preliminary design study for the project. The present authorized contract amount for preliminary <br /> design is $82,609 and is supplemented by this amendment to add $283,550 for a total authorized contract amount of <br /> $366,159. Construction is anticipated to occur in 2008 and is estimated to cost approximately$1 million. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with URS <br /> Corporation for engineering services for Sewer System Capacity Improvements "J" project in the amount of <br /> $283,550 for a total contract amount of$366,159. <br /> S:\DVoigt\Sewer J_URS_UP3270\Council\URS PSA Amend 1_Cncl Agenda Cover.DOC I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.