My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/11/14 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/11/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2017 8:33:43 AM
Creation date
3/20/2017 8:33:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/14/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: 6 <br /> Amendment No. 1 with Brown X Consent COUNCIL BILL# <br /> & Caldwell for the Design and Action Originating Department Utilities <br /> Production of the Water Filter First Reading Contact Person Mike Robinson <br /> Plant Operation and Second Reading Phone Number 425-257-8203 <br /> Maintenance Manual. Third Reading FOR AGENDA OF 14NOV07 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA !$) <br /> Council President „ <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filter Plant Consultant Design Amendment No.1 Public Works-Utilities <br /> Contract <br /> Amount Budgeted $55,000 <br /> Expenditure Required $0 Account Number(s): 401-5-200-121-932-480 <br /> Budget Remaining $42,500 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Extend the PSA with Brown & Caldwell to December 31st,2008 for the design and production of the Water Filter <br /> Plant's Operation and Maintenance Manual. The deliverable will include an updated Water Filtration Plant <br /> Operation and Maintenance Manual to be incorporated into the WFP's electronic library and one hard bound <br /> copy. This is a regulatory requirement. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No.1 to the professional service agreement with Brown & <br /> Caldwell for the design and production of the Water Filtration Plant Operation and Maintenance Manual. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.