Laserfiche WebLink
YE T CQUIaTG1I, A A ITL11�I C0 1ER SXf T <br />PROJECT TITLE: <br />Advertising for Statements of <br />Qualifications/Proposals from <br />Engineering Consultants for <br />the Water Transmission Line <br /># 2 Replacement — Phase 8B <br />Consent <br />X Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />PW/Utilities <br />Souheil Nasr <br />425-257-7210 <br />Nov. 21". 2007 <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Location Preceding Action Attachments Department(s) Approval <br />Water Transmission Legal <br />Lines Northern Corridor, <br />between S Lake Stevens <br />Rd and the Pilchuck <br />River. <br />Amount Budgeted <br />$ 7,000,000 <br />Expenditure Required <br />$ 2,000 <br />Account Number(s): UP -3333 <br />Budget Remaining <br />$ 6,998,000 <br />Additional Required <br />0 <br />DETAILED SUMMARY STATEMENT: <br />The City of Everett capital budget includes complete replacement of its water transmission lines No. 2 and <br />No. 3. The replacement will occur over several phases. This RFQ/RFP covers phase 8B, however, the City <br />reserves the right to amend this contract to cover subsequent phases. The work under this phase (phase 8B) <br />will consist of replacing approximately 5,000 feet of 48 -inch diameter steel pipe. Transmission line No. 2 is a <br />77 -year old buried pipeline which is reaching the end of its useful life. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize staff to advertise for Statements of Qualifications/Proposals from qualified engineering consultants for the <br />Water Transmission Line # 2 Replacement — Phase 8B. <br />N <br />S:\SNasr\TL Phase 8B\Agenda Ad for SOQ.DOC <br />